Installation
ST94-21 C/Ku-Band TVRO
3-10
12.
After removing these 8 bolts the Pedestal
Assembly is free to be removed from the
crate.
13.
Use a crane, or other suitable lifting
apparatus, to lift the pedestal off of the crate
and relocate it to the area where the
pedestal will be sub-assembled.
3.7.
Unpacking the Radome Crate:
It is recommended that you do not unpack the crates until you are ready to sub-assemble the equipment. This crate
should be place in the location that you have chosen to assemble the radome onto the base frame.
Unpacking the Radome Crate:
1.
Open the crate, to expose the contents, as
described above.
2.
Use diagonal cutters, or shears, to cut the
bands that restrain the radome panels in the
crate. Do not remove the panels at this time,
they will be removed during the radome
assembly (refer to the Antenna Manual,
Installation chapter).
3.
Remove the straps that restrain the radome
cap. Leave the radome cap on the pallet
with the radome panels for use during the
radome assembly.
4.
Use diagonal cutters, or shears, to cut the
bands that restrain the Hardware kit in the
crate. Leave the hardware kit on the pallet
with the radome panels for use during the
radome assembly.
5.
Use diagonal cutters, or shears, to cut the
bands that restrain the box of Silicon
Adhesive in the crate. Leave the Silicon
Adhesive on the pallet with the radome
panels for use during the radome assembly.
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...