7
Insert hose into the
first chamber valve and
pump until firm. This is
the safety chamber.
SET UP
|
Inflation
Optional Floorboard
Insert floorboard after
inflating the first
chamber. Center in the
boat but do not cover
the rod holders. (Holes
in the board are not
used with PackFish 7.)
Insert hose into the
second chamber and
inflate until firm. This
is the main flotation
chamber. Most of the
wrinkles should be out
of the cover.
Deluxe Inflatable
Green Seat
Attach valve to bases.
Inflate the seat so that
it is comfortably firm.
Tighten valves very
firmly to avoid
deflation.
Two-Part Oars
Each oar has a shaft,
drip guard and blade.
Left and right are
assigned by looking at
the boat from the back
towards the front.
Push the drip guard
onto the shaft all the
way to the black grip.
Insert shaft in oarlock
ring.
Slide the blade onto
the shaft and adjust
until the button pops
up through the hole.
Repeat assembly for
the other side.
Orient the curve of
the blades to cup the
water on the power
stroke.
Summary of Contents for PackFish 7
Page 5: ...4...