P:\INST INSTRUCTIONS\ELECTRIFIED LOCKSETS\INST-ZR7500
REV C
05-22
Page 1
Any suggestions or comments to this instruction or
product are welcome. Please contact us through
our website or email [email protected]
A. Door Preparation:
1. Measure desired height from finished floor, mark a horizontal line on door and door edge.
2. Align template on edge of door with applicable horizontal at height line. Check the chart for drilling trim
holes on template and mark only holes for lock function being installed.
3. Mortise door edge according to measurements on installation template and drill proper holes for trim.
4. Recess for face plate, the dimension is:
L 8-1/32" x W 1-5/16" x D 7/32".
Height
line
of lever
C
L
7/32"
ZR7500 SERIES
RETROFIT SOLENOID FRAME ACTUATOR
CONTROLLED MORTISE LOCKSET
of cylinder
of lockcase
of lever rose shown
Vertical centerline
C
Installation
template
C
L
C
L
C
L
L of door edge
INSTALLATION INSTRUCTIONS
SECURITY DOOR CONTROLS ■ WWW.SDCSECURITY.COM
[t] 800.413.8783 ■ 805.494.0622 ■ E-mail: [email protected] ■ 801 Avenida Acaso, Camarillo, CA 93012 ■ PO Box 3670, Camarillo, CA 93011
Note:
Rose door prep shown as example.
Escutcheon door prep would differ.