Location:
After uncrating and inspection, the unit
is ready for installation. It is important
that the machine be installed in a
location where it has enough space
around it to be accessible for service,
usually a minimum of 6 inches. Try to
avoid hot, dirty and crowded locations.
Be sure that the location for the
machine is within the limitations
described on page 3.
Storage Bin:
Tip the storage bin on its back, using
parts of the carton to protect the exterior
finish. Install the legs into the threaded
holes in the bottom of the bin. Turn the
leg levelers all the way in preparation
for leveling later. Return the bin to the
upright position, remove paper covering
the bin gasket.
Install bin top if required, follow the
directions included with the bin top.
Note: Do not push bin into position, but
lift it there. Pushing a bin, especially
one with ice in it, can cause damage to
the legs and the leg mounts.
Ice Maker:
The machine is heavy, so the use of a
mechanical lift is recommended for
lifting the machine high enough to install
on top of the bin. After the unit is placed
on the bin, line it up so it is even with
the back, left, and right sides. Secure
the machine to the bin with the
hardware provided with the machine.
Remove the front panel and remove the
styrofoam shipping blocks from under
the gearmotor, the top of the ice chute, and
from between the gearmotor and the right side
panel.
FOR THE INSTALLER
LEVEL THE ASSEMBLY
FASTEN THEMACHINE
TO THE BIN WITH THE
HARDWARE SUPPLIED
WITH THE ICEMAKER
GASKET
FM1500R
November, 1988
Page 5