FOR THE INSTALLER: Final Check List
1. Is the ice system installed
indoors in a location where
the air and water
temperatures are controlled,
and where they do not exceed
the design limitations?
2. Is there an electrical
service disconnect within sight
of the installed machine? Has
the voltage been checked,
and compared to nameplate
requirements?
3. Have all the plumbing
connections been made and
checked for leaks?
4. Has the machine and bin
been leveled?
5. Is there a minimum of 6"
clearance at the rear, left, and
right of the machine for proper
service access and air
circulation?
6. Is the water pressure a
minimum of 20 psig?
7. Has the machine been
secured to the bin?
8. If two units on one
condenser, has the relay kit
been installed?
9. Is there a water shut off
valve installed near the
machine?
10. Is the remote condenser
installed per local building
codes, and in a place where it
has adequate ventilation and
minimal solar heat gain?
11. Has all shipping material
and literature (inside the front
panel) been removed from the
units?
12. Have the remote condenser and
precharged lines been properly installed?
13. Has the electrical connection between the
icemaker and the condenser been made?
14. Verify that the master switch is in the OFF
postion.
15. Switch on the electrical power.
16. Refer to Pre-Start instructions, the next
page.