Correct Settings
• Bridge Thickness
– Must release ice as a unit, bridge will be about 3/16
inch and there will be a hollow part in the cube
• Harvest Time
– Must continue long enough to release the ice, plus
10 to 20 seconds more.
– Water fills during harvest, short harvest may increase
scale build up
• Add time if needed to reduce scale build up
• 90 seconds is suggested minimum time in typical water
Summary of Contents for CU0415
Page 1: ...Technical Training CU0415 CU0715 CU0920 Essential Ice ...
Page 2: ...Presentation Topics Introduction Installation Operation Cleaning Diagnostics Service ...
Page 5: ...Evaporator Nickel Plated Copper Mounted inverted above spray platform ...
Page 11: ......
Page 13: ...Installation Water and Drain all models Drain is FPT Must be vented ...
Page 22: ...K1 K1 K1 K2 K2 ...
Page 25: ...Ice Bridge 3 16 ...
Page 26: ...Adjustments Increase or Decrease Bridge Thickness Increase or Decrease Harvest Time ...
Page 33: ...Cleaning and Maintenance ...
Page 35: ...Reservoir Drain Plug ...
Page 37: ...Spray Platform Inlet engages clip in reservoir pull forward to remove ...
Page 38: ...Spray Platform Assembly ...
Page 40: ...Maintenance and Cleaning Clean air cooled condenser Vacuum and brush dirt from fins ...
Page 59: ...Cabinet Removal Lift bin with reservoir off the deck Remove deck cover Deck Cover ...
Page 60: ...Cabinet Removed ...
Page 61: ...Questions ...