![Scotchman SHEARMASTER 610 Manual Download Page 16](http://html1.mh-extra.com/html/scotchman/shearmaster-610/shearmaster-610_manual_1218578016.webp)
FIGURE 6
PAGE 15
GREASE
POINTS
5.2 SCHEDULED MAINTENANCE
A program of scheduled maintenance should be set up and documented according to your application
and the frequency you use this machine.
The following is a list of some important items that should be included in a scheduled maintenance
program.
Since the 610 Shear can be used for a wide variety of applications, every user must design and implement
a scheduled maintenance program that fits their needs.
1. EVERY 500 HOURS OR SIX MONTHS:
B. Check the condition of all cutting blades on the machine.
C. Check the condition of the bushings in the shear beam. This can be done visually by watching the
beam for vertical movement while the machine is in operation. If vertical movement is noted,
block or support the beam with a lifting device and remove the main pin and check the clearance. If
the clearance exceeds twelve thousandths (.012) of an inch (.3mm), replace the bushing.
2. EVERY 1,500 HOURS OR 1 YEAR:
A. Change the hydraulic fluid in the reservoir and replace the filter. For recommended fluids, SEE SEC-
TION 5.1.
Summary of Contents for SHEARMASTER 610
Page 1: ...You have downloaded a manual for our Model SHEARMASTER 610 Ironworker...
Page 2: ...www scotchman com MODEL SHEARMASTER 610 24 PLATE SHEAR SEPTEMBER 2021...
Page 12: ...PAGE 11 FIGURE 4...
Page 14: ...PAGE 13 FIGURE 5...
Page 24: ...PAGE 23 FIGURE 13...
Page 34: ...PAGE 31 FIGURE 14...
Page 38: ...PAGE 35 FIGURE 17...
Page 40: ...PAGE 37 FIGURE 18...
Page 42: ...FIGURE 19 PAGE 39 A H G I J K A B B L M O N P D C A B Q F E R...
Page 46: ...PAGE 43 FIGURE 22...
Page 48: ...PAGE 45 FIGURE 23...
Page 50: ...PAGE 47 FIGURE 24...
Page 51: ...PAGE 48 9 12 ELECTRICAL HYDRAULIC SCHEMATICS FIGURE 25...
Page 52: ...PAGE 49 FIGURE 26...
Page 53: ...PAGE 50 FIGURE 27...