9
3.2
Operation
3.2.1
Instrument preparation
•
The instrument should be placed on a stable surface and well ventilated without
any flammables or explosives.
•
Ensure that the label indicated the correct voltage before connecting the device
to power supply.
•
Ensure that the power socket is grounded properly.
•
Inject at least 5L of coolant into the reservoir.
•
Connect the power cable of the low-temperature cooling circulating pump to
your instrument and switch ON the low-temperature cooling circulating pump.
•
Set the operating conditions of refrigeration or circulation via. Operation setting
panel.
Note:
Ensure that the inlet and outlet valves are closed when injecting
coolant into the reservoir.