background image

 

 

                                                                                                    6 

2 Technical Parameter 

Model 

CUSFY-1 

Power Supply 

DC24V 

MAX Power 

40W 

Average Power Consumption 

5 W 

Temperature Range 

RT+5 

 

  100

 

Timing Range 

1sec

999sec 

1min   

  999min 

1hour

99hour 

Temperature Precision 

≤±

  0.3

 

Display Accuracy 

0.1

 

Heating up Time 

(from 40 

  to 100

20min 

Environment Temperature 

5

 

  35

 

Overall Dimension

W

×

D

×

H

 

110mm

×

148mm

×

120mm 

Net Weight 

0.5 kg 

 

3 Safety Warning 

It is used indoor.

 

 

 

It might cause personal injury if you did not read the manual before operation. Only trained person 

in installation and operation of electrical equipment are qualified to use this device. 

 

You may get electric shock and lose warranty if you disassemble it. 

 

 

Summary of Contents for Mycotox CUSFY-1

Page 1: ...1 Operation Manual for Mycotoxin LFD Incubator CUSFY 1...

Page 2: ...stallation 5 2 Technical Parameter 6 3 Safety Warning 6 4 Operation Procedure 7 4 1 Set up a new Procedure 7 4 2 Set S N of Procedure 7 4 3 Set Temperature 7 4 4 Set Time 7 4 5 Set Time Unit 8 4 6 Pro...

Page 3: ...oods and contact us immediately if you found any parts mismatched missing or damaged 1 Introduction Incubator is new product controlled by microcomputer It is widely used for sample preservation and r...

Page 4: ...4 1 2 Primary Structure Metal Module Display Operation Panel Power Switch Power Input Socket...

Page 5: ...r input socket then connect the other end of power adapter with power grid between 100V and 240V Check below chart 1 3 3 Power switch on and then it will reach to setting temperature Basically it take...

Page 6: ...y 0 1 Heating up Time from 40 to 100 20min Environment Temperature 5 35 Overall Dimension W D H 110mm 148mm 120mm Net Weight 0 5 kg 3 Safety Warning It is used indoor It might cause personal injury if...

Page 7: ...em comes to operation interface Press Start Stop key over 2 minutes then is goes into Setting up Procedure interface You can DIY 9 procedures P1 to P9 Each procedure includes 3 sections move A B C 28...

Page 8: ...o A Stop key 4 6 6 It will send warning tone at one minute at a time and also display FINISHED after running complete procedure Meanwhile it will remain at current temperature Please turn off the powe...

Page 9: ...will exit current menu without saving configuration information 4 7 2 Automatic recovery after power failure ORF Enable ORF it will get back to the procedure run before power failure once when power o...

Page 10: ...ntact us Module did not heat up Heater malfunction Contact us Key malfunction Broken membrane switch Contact us Regularly clean longhole on module with clean soft cloth that takes a little absolute al...

Reviews: