
A-CR-CCP-402/MB-001 SCHWEIZER 2-33 AOIs
C-1
ANNEX C - GLIDER FINAL ASSEMBLY CHECKLIST
1.
A final check shall be carried out after a full assembly. This check should be performed by
more than one person to ensure that all assembly points are double-checked.
2.
A Daily Inspection shall also be completed prior to the first flight.
1. WINGS
1
ST
2
ND
a. Surfaces checked
b. Strut attachment bolts, washers, nuts and safety/cotter pins:
(1) Fuselage (LH & RH) – hardware installed
(2) Wings (LH & RH) - hardware installed
(3) Aileron locks (LH & RH) - removed
2. SPAR BOLTS, SPACERS, NUTS & PINS
a. Forward Spar (LH & RH) – hardware installed
b. Rear Spar (LH & RH) – hardware installed
c. Spacers – installed under nuts & can be rotated by hand
3. SPOILER CONTROL
a. Pin and safety/cotter pin – hardware installed
4. AILERON CONTROLS
a. bolts, nuts, and cotter pins
5. ELEVATOR CONTROL
a. Push rod, bolt, nut and safety/cotter pin – hardware installed
6. TAIL SECTION – HORIZONTAL STABILIZER
a. Horizontal stabilizer & strut attachment bolts, washers, nuts, cotter pins:
(1) Horizontal stabilizer attachment – hardware installed
(2) Struts - fuselage attachment (LH & RH) – hardware installed
(3) Struts - horizontal stabilizer attachment (LH & RH) – hardware
installed
7. LOG BOOK ENTRIES (2) COMPLETED
a. Aircraft assembled in compliance with the SGS 2-33 Sailplane
Flight - Erection - Maintenance Manual.
b. Flight controls checked for correct assembly, locking and sense of
operation
(must be an independent check)
GLIDER REGISTRATION:
DATE:
NAME & SIGNATURE (1
ST
):
NAME & SIGNATURE (2
ND
):
Place document in the aircraft logbook when completed
(Checklist updated 2016)
Summary of Contents for 2-33
Page 2: ......
Page 20: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 2 8 Page intentionally left blank ...
Page 32: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 3 12 Page intentionally left blank ...
Page 45: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 6 7 RCA Ops O or RC Eng O ...
Page 46: ...A CR CCP 402 MB 001 SCHWEIZER 2 33 AOIs 6 8 ...