Protection Applications Examples
EHV Parallel 230 kV Underground Cables Example
Employ each zone of distance protection as follows:
➤
Zone 1—Instantaneous underreaching direct tripping
➤
Zone 2—Forward-looking tripping elements for the POTT scheme
and backup tripping
➤
Zone 3—Current reversal guard for the POTT scheme, echo tripping,
and weak infeed logic
Zone 1 Reactance
The reach of the Zone 1 reactance measurement of the quadrilateral ground-dis-
tance elements must meet the same requirement as that for Zone 1 mho phase-
distance protection; the reach setting can be no greater than 80 percent of the
cable.
XG1 = 0.8 • |Z
1L1
| = 0.8 • 0.48
= 0.38
XG1 :=
0.38
.
Zone 1 Reactance (OFF, 0.05–64
secondary)
Zone 1 Resistance
Find RG1 (Zone 1 Resistance) from the per-unit reach m of the Zone 1 reactance.
Use
, which is
Equation 3
in Appendix
A—Quadrilateral Reactive
Reach Versus Resistive Reach Setting Guideline
from the paper
Digital Commu-
nications for Power System Protection: Security, Availability, and Speed
selinc.com for a copy of this paper):
Equation 6.55
XG1 is set at 80 percent of the underground cable (i.e.,
m
= 0.8 per-unit); the pos-
itive-sequence reactance of the cable, X
1L1
, is 0.323
secondary (from the rect-
angular form of Z
1L1
).
Figure 6.21
Quadrilateral Ground-Distance Element Reactive Reach Setting
X
XG
R
where:
m = per-unit reach of XG1
R = RG1 (the Zone 1 resistance)
X
1L1
= positive-sequence transmission line reactance
m
1
R
X
1L1
20
•
-------------------------
–
=
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...