![SCHUNK WBL 85 Balfour Beatty Maintenance And Operating Manual Download Page 26](http://html.mh-extra.com/html/schunk/wbl-85-balfour-beatty/wbl-85-balfour-beatty_maintenance-and-operating-manual_1215849026.webp)
WBL 85-15kV
Adjustment Work
Single Arm Pantograph WBL 85 Balfour Beatty
Page 26
If fine tuning is required, proceed as follows:
❑
Lower pantograph, bellow has to be completely without pressure.
❑
Loosen lock nuts (3) on both drive wire ropes.
❑
Adjust length of wire ropes by means of hexagonal nuts (4) until parallelism
between the connection plate (1) and base shaft (2) is accomplished.
❑
Verification through raising and lowering of pantograph.
❑
Secure again with lock nuts.
❑
Final inspection of the fine tuning through raising and lowering of the
pantograph.
10.3
Adjusting the Bellow Drive
Check:
Lift and lower the pantograph. Parallelism of the connection plate (1)
to the base shaft (2) of the lower frame has to be assured during the
raising and lowering procedures.
Connection Plate (1)
Base Shaft (2)
Lock Nut (3)
Hexagonal Nut (4)
Hexagonal Nut (4)
Summary of Contents for WBL 85 Balfour Beatty
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 56: ......