![SCHUNK WBL 85 Balfour Beatty Maintenance And Operating Manual Download Page 17](http://html.mh-extra.com/html/schunk/wbl-85-balfour-beatty/wbl-85-balfour-beatty_maintenance-and-operating-manual_1215849017.webp)
Maintenance
Single Arm Pantograph WBL 85 Balfour Beatty
Page 17
WBL 85-15kV
7.4
Screw Connections
All mounting screws are to be checked for damage and tight fit, especially:
-
Mounting screws for carbon strips.
-
Pan Head connections.
Hex nuts according DIN 985 must be replaced by new ones after dismounting !
7.4.1
Fastening Moment for Screw Connections
7.5
Bellow Drive
The bellow drive is maintenance free.
Check bellow drive for operation during each main inspection by lifting and lowering
the pantograph. If needed, replace damaged or bent parts.
The cables are to be greased with TOP 2000 of AGIP Schmiertechnik, if necessary.
7.6
Pneumatic Control Unit
During each main inspection the safety valve needs to be tested by increasing the
pressure through the pressure regulator.
After completed test, adjust contact pressure to required level.
Thread
Fastening
Moment
M3
1,1 Nm
M4
2,6 Nm
M5
5,1 Nm
M6
8,8 Nm
Thread
Fastening
Moment
M8
21,4 Nm
M10
44,0 Nm
M12
74,0 Nm
M14
119,0 Nm
Thread
Fastening
Moment
M16
183,0 Nm
M20
370,0 Nm
Summary of Contents for WBL 85 Balfour Beatty
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 56: ......