Maintenance
03.00 | ERS 135 - 210 / 560V | Assembly and Operating Manual | en | 389064
51
7 Maintenance
7.1 Maintenance intervals
DANGER
Risk of fatal injuries due to electric shock!
If the electrical connections are released from the live product,
arcing may be the result.
•
Before working on the product, switch off the energy supply.
•
Only have work performed on the product by an expert
electrician.
Interval [Mio. cycles]
for
ERS 135 - 210
Maintenance work
2.5
Check bearings for noise,
51].
2.5
Dry clean all parts thoroughly, check for
damage and wear,
51].
20
Grease all bearings,
51].
20
Replace all seals,
52].
7.2 Servicing the product
NOTE
For maintenance work or repairs, send the product along with a
repair order to SCHUNK.
visual inspection
The regular visual inspection of all supply lines is required for the
perfect operation of the product.
Ø
Perform a visual inspection on all supply cables.
Ø
If supply lines are defective, put the machine/system out of
operation immediately.
Ø
Replace damaged connection cables.