20
257 838
08.2012
9.1. Example: connecting a free-standing installation using the PSI system Schüco SGI 4500T inverter
9.2. Example: connecting an on-roof installation using the PSI system and SMA inverter (SMc 7000 HV)
WARNING
► For parallel connection, it must be ensured that only a maximum of
three strings are connected without additional line fuses !
Summary of Contents for MPE 100 AL 01
Page 23: ......