9
M
AINTENANCE
B
YPASS DISTRIBUTION PANEL AND ACCESSORY
USSDHOTSW8
…
INSTALLATION
ATTENTION: the installation must be performed by qualified personnel only.
Example image
(distribution panel for three phases installation)
NOTE 1: The SWIN and SWOUT (and SWBYP) switches are not
mandatory but recommended, as the wiring connector is
protected from direct contact.
NOTE 2: It is suggested that the mains cables enter from the upper side
of the panel. Fit the cables to exit towards the UPS and the load
on the lower side of the panel.
NOTE 3: Upstream of the distribution panel input line, install the
protection device prescribed in the UPS user manual
NOTE 4: For sizing of the minimum section of the cables, refer to the
UPS user manual.
NOTE 5: The switches used must have a current capacity greater than
the nominal current of the UPS connected.
WIRING DIAGRAM for single phase installation
DISTRIBUTION PANEL DIAGRAM
INDICATIONS ON THE KIT
CABLES YSDUE17…
L_FUSE
N_IN
SW_BYP
SW_BYP
L_OUT
N_OUT
EARTH
MAINS
LOAD
TO UPS
NOTE: insulate
the unused wires
with a clamp