PRESENTATION
The Hot Swap kit allows you to create a UPS isolation system without interrupting the power supply to the load thanks to the
use of the plug-socket kit and a control peripheral panel (made by the installer).
COMMISSIONING
REPLACING
THE
UPS
IN
/
OUT
TERMINAL
COVER
ALL OPERATIONS DESCRIBED IN THIS SECTION MUST BE PERFORMED BY QUALIFIED
PERSONNEL ONLY. Our Company assumes no liability for damages caused by incorrect connections
or operations not contained in this manual.
The UPS has HAZARDOUS electrical voltages inside it, even when the input and/or battery switches
are off. The inside of the UPS is protected by safety panels which should not be removed by untrained
personnel. All installation and maintenance or operations involving access inside the UPS require the
use of tools and may ONLY be performed by trained personnel.
To carry out the following operations, the UPS must be disconnected from the mains power supply,
switched off, and with all the equipment switches and fuse holders open.
Remove the terminal cover by removing the securing
screws as shown in the figure.
Remove any existing connections from the terminals.
NOTE:
To remove the cables, insert a flat screwdriver in
the slot of the clamp located above the cable entry.
Removal example (Model 5-6 kVA)
Fit the newly supplied terminal cover complete with socket
as shown in the figure
New cover (Model 4-5-6 kVA)