10
Requirements:
- Tension meter switched on (Ch. 3.3.2).
- Damping factor set, if necessary (Ch. 3.4.2).
- Zero adjustment carried out (Ch. 3.3.5).
3.4 Operating Procedure
To insert the process material:
- Push the LEVER in the direction of the arrow to lift the REFERENCE FRAME and
the OUTER ROLLERS.
- Insert the MEASURING ROLLER into the warp.
- Push the LEVER back into the original position to move the REFERENCE FRAME
and the OUTER ROLLERS down again.
It is important to assure that the warp passes smoothly between the MEASURING
ROLLERS and the OUTER ROLLERS.
To measure the process material:
The DISPLAY now shows the measured tension values.
Error messages which might be displayed are described in Chapter 3.6.
To remove the process material:
- Push the LEVER in the direction of the arrow to lift the REFERENCE FRAME and
the OUTER ROLLERS.
- Remove the MEASURING ROLLER from the warp
LEVER
MEAS. ROLLER
OUTER ROLLERS
fig. 3.4
REFERENCE
FRAME
After removeing the process material, move the REFERENCE FRAME down
by using the leve, to protect the MEASURING ROLLER of damage.