6 Installation
6.1 Installation Instructions
For safe installation, the following instructions must be observed:
CAUTION
Improper installation or maintenance
Personal injury or damage to property
4
Before installation and maintenance work, the product must be depressurized (ventilated to the
atmosphere).
1. Use only the connections, mounting holes and attachment materials that have been provided.
2. Carry out assembly or disassembly work only when the device is depressurized.
3. Pneumatic connections must be firmly connected to the vacuum reservoir and secured.
6.2 Transport
The vacuum reservoir (VOL 50–200) can be transported or set up with the aid of a suitable lifting crane and suitable
lifting slings (note the maximum lift capacity of the lifting device).
6.3 Installation Site
DANGER
Risk of fire and explosion due to switching components that are not explosion-proof
Serious injury or death!
4
Do not use the product in environments where there is a risk of explosion.
The Vacuum reservoir must not be operated in rooms where there is a risk of explosion.
The ambient temperature must be b5°C and +40°C. (Contact the manufacturer prior to operation if this
range is to be exceeded).
Provide internal instructions and conduct checks to ensure that the area of the workplace is always clean and tidy.
6.4 Installation Procedure
4
Screw the vacuum reservoir onto the installation site using fastening screws. To do so, use the mounting sock-
ets or holes located on the reservoir.
6.5 Connecting the Vacuum Pump and Gripping System
1. Establish the connection to the vacuum pump via
the G1 thread on the non-return valve using a suit-
able vacuum hose.
2. Establish the connection to the vacuum gripping
system via the G2 thread on the vacuum filter us-
ing a suitable vacuum hose.
EN-US · 30.30.01.02412 · 00 · 03/20
7 / 9