background image

InstallatIon guIde Rapid

16

 module clamps

© SCHLETTER SOLAR GMBH | I400339 | V0 | 07/2018 | We reserve the right to changes.

2 | 8

geneRal InstRuCtIons

M8 screw fittings: 15 nm

screwdriver with bit holder Bit tX drive t40

Planning, installation and start-up of the solar power system are to be done only 
by qualified professionals. Improper execution can damage the system and the 
building and endanger people.

Falling hazard! during all work on the roof, and when climbing up and down, 
there is a risk of falling. always obey the accident prevention regulations and use 
appropriate fall protection equipment.

Injury hazard! People can be injured by falling objects. In the hazard area, before 
starting installation, set up barriers and warn people in the area.

Break hazard! PV modules can be damaged if they are entered or improperly 
handled.

electrical current hazard! Installation and maintenance of the PV module must be 
done only by qualified professionals. obey the PV module manufacturer's safety 
instructions!

tools needed

FastenIng toRQue

saFetY InstRuCtIons

Reviews: