Roller sieve, frame arms, Fig. 1
Attach the frame arms (2) to the pre-assembled roller
sieve (1).
2 spacer pins
(a)
4 serrated lock washers
ø8,2
(b)
4 hexagon nuts
M 8
(c)
1 hexagon bolt
M10x70 (d)
1 small washer
ø10
(e)
1 hexagon nut M10
(f)
Frame struts, frame wall, Fig. 2
Assemble frame struts (4) and frame wall (7).
6 hexagon bolts
M8 x 65 (g)
6 washers
ø8
(h)
6 serrated lock washers
ø8,2
(b)
6 hexagon nuts
M8
(c)
Mind the correct diagonal-cut strut position.
Supporting legs, Fig. 3
Attach the supporting legs (8) to the frame struts (4).
2 hexagon bolts each
M8x45 (i)
2 serrated lock washers each
ø8,2
(b)
2 hexagon nuts each
M8
(c)
Wheels, Fig. 4
Fit the wheels (9) to the frame struts (4).
1 cheese-head screw each
M10x95 (j)
1 washer each
ø10
(e)
1
bush
each
(k)
2 hexagon nuts each
M10
(f)
When reversing and tightening the hexagon nuts,
make sure the wheels turn easily.
Fit the lower bolts into the frame wall (7).
2 hexagon bolts
M8 x 65 (g)
2 washers
ø8
(h)
2 serrated lock washers
ø8,2
(b)
2 hexagon nuts
M8
(c)
Frame arms, frame struts, Fig. 5
Bolt together frame arms (2+3), frame struts (4), gus-
set plates (5+6) and the transport bow (11) .
6 hexagon bolts
M8x65 (g)
8 serrated lock washers
ø8,2
(b)
6 hexagon nuts
M8
(c)
2 hexagon bolts
M8 x 70 (l)
Fasten the gusset plate with the cable clamp (5) at
the front right side.
Sieve drum insert
The drum remains attached to the frame.
Remove the drum bars fitted to the drum inside in
longitudinal direction. For the following remounting,
mark the position of the drum bars with a felt pen.
Fig. 6
Place the sieve insert (10) into the sieve drum in such
a way that the sieve edge is covered by a drum bar.
Push the rings at front and back into the sieve drum
and put them into a vertical position in the drum.
Fig. 7
Bolt the rings through the sieve mashes.
3 Allen screws each
M6x16 (m)
3 washers each
ø6
(n)
3 serrated lock washers each
A8,3
(o)
3 hexagon nuts each
M6
(p)
Continue mounting both drum bars at the points ear-
lier marked with a felt pen.
10. Putting into operation
m
ATTENTION!
Always make sure the device is fully assembled
before start-up!
Filling with material Fig. 8
Soil is always filled into the drum from the front.
• Before putting the implement into operation, ob-
serve the safety instructions.
•
All guards and safety devices must be fitted.
• After connection to the electrical power, your
RS400 is ready for service.
• Always attach the power cable to the clamp in the
gusset plate.
Setting up, Fig. 9
Depending on the place of setting up, incline the sieve
drum as required. Displace the hexagon bolt (arrow).
The degree of inclination depends on the type of soil
to be sieved.
For loose material we recommend more inclination,
and for solid material less inclination.
Angle positioning large - faster throughput - top hole
Angle positioning small - slower throughput - bottom
hole
Electrical connection
The installed electrical motor is connected and ready
for use. The connection meets the corresponding
VDE and DIN regulations.
The power connection on the part of the client, as
well as the extension cables used, must meet these
regulations.
Faulty power supply cables
Insulation damage often occurs at power supply ca-
bles.
Summary of Contents for rs 400
Page 156: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58 156...
Page 157: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58 157 4203 0004...
Page 158: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58 158...
Page 160: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58...