DOMA019EN v8_10-2015– Shado
®
User Manual
Page 6 / 24
temperate room until the equipment has achieved proper working temperature.
Head rail and foot rail mounting
Unpacking
Unpack the parcel with the usual care, Take off the trolley from the parcel after having unlocked the
brake pedals.
One N°5 Allen wrench and one 13mm flat wrench (not provided) are necessary.
Head rail mounting
Screw off the 4 locking nuts from the screws.
Adjust the head rail and tighten the 4 screws until the rail is completely blocked.
Please pay attention to the command cable during this assembly: do not pinch it or catch it
under the rail.
Foot rail mounting
With the help of the fixing bolts, secure the foot rail and the draining hose holder hook to the
stretcher.
Head Rail
Locking nuts
Foot rail
Locking nuts
Draining hose
holder hook
Locking
nuts