![SCALE-TEC GRAIN CART Instructions Manual Download Page 7](http://html1.mh-extra.com/html/scale-tec/grain-cart/grain-cart_instructions-manual_1206081007.webp)
Junction Box Mounting
7600414 REVA
Page 7
JUNCTION BOX MOUNTING
Four Hole Junction Box
The junction box is water resistant, not water-proof. It should be mounted to avoid submersion during
wetweather and to avoid physical abuse. The junction box can be mounted on the frame of the grain
cart. All load cell cables must reach the J-Box. Install by removing the double sided tapebacking and
apply to cleaned surface.
Connect Load Cell and Indicator “J-Box” Cable
1. Route front and rear load cell cables to J-box location.
Make sure they are not bound or pinched. Cable tie
(customer provided) load cell cables in place.
2. Insert load cell and J-box cables through each of the
water-tight strain-reliefs.
3. Remove each terminal block from the J-box.
4. Connect wires of the same color to the same terminal
block as shown above. See instructions below.
5. Install terminal block into the J-box as shown (location
not important).
6. Tighten nuts on the water-tight strain-reliefs.
7. Assure that gasket is properly installed in the cover.
8. Attach cover using 4 screws (provided).
Installing Wires into Terminal Block
1. Open levers 90º to locked position.
2. Insert individual wires into terminal.
3. Close lever.
4. Tug wire to assure solid connection.