![background image](http://html1.mh-extra.com/html/scag-power-equipment/tlb25-35bv-series/tlb25-35bv-series_operators-manual_1205757023.webp)
19
Section 5
R
5.6 IMPELLER SHAFT BEARINGS
WARNING
Before applying grease to the bearings, shut the
engine off, remove the ignition key and allow the
engine and exhaust to cool.
1. Apply grease to the two bearing carrier grease
fittings located on the left side of the machine
every 50 hours or weekly, whichever comes first, of
operation. See Figure 5-3.
GREASE FITTINGS
Figure 5-3. Impeller Shaft Grease Fittings
5.7 WHEELS & TIRES
Check the condition of wheel assemblies after 8 hours of
operation or daily.
5.8 TRAILER LIGHTS
Check the trailer lights for proper operation every day
before operation. Replace any defective component before
operating.