background image

 
 

 BLOWER OPTION INSTALLATION 

 

A thermal switch must be installed for proper blower operation. To do so, follow these 
steps. 
 

WARNING: ENSURE THAT THE POWER IS OFF BEFORE STARTING 
INSTALLATION.  

 

1- 

Remove the 4 screws (Q) of the junction box’s localization cap 

(R)

. Save the screws. 

 

2- 

From the rheostat, bring the cable 

(S)

 (14/2 AWG) from above and through the 

opening in the air distribution box. 

 

3- 

From your electrical panel, bring a cable 

(T)

 (14/2 AWG) through the same opening 

as the 

Step 2

 

 

Caution:

 make sure that the two cables 

(S)

 and 

(T)

 comply with all minimum 

clearances to combustibles specified in 
the manual or on the certification plate of 
the fireplace, then attach them to the wall 
structure to prevent them from coming into 
contact with a hot part of the fireplace or 
air distribution system. 

Reviews: