Saunier Duval THEMA F 23 E Installation And Servicing Instructions Download Page 20

20

• Fit replacement PCB in reverse order to removal.

Important:

 When fitting replacement PCB, ensure

that control knob spindles correctly locate into PCB
adjuster slots.
• Refit connectors and covers in reverse order to
removal.

To replace ignition PCB

• Gain access to PCB's as described in previous
section.
• Remove main PCB securing screw as described
in previous section.
• Pull off three electrical connectors on PCB.
• Lift up ignition PCB, separate from main PCB and
remove from boiler.
• Fit replacement PCB in reverse order to removal.
• Refit connectors and covers in reverse order to
removal.

To replace pump

• Drain down heating circuit of boiler only as fol-
lows:
• Close isolating valves on flow and return connec-
tions on fixing jig, 

see diagram 5.

Note:

 These valves are closed when slots are at right

angles to direction of flow.
It is not necessary to drain entire heating circuit to
carry out this work.
• Drain boiler by attaching a plastic tube to drain
outlet and opening drain valve knob anticlockwise,

see diagram 5.

• Gain access to pump connection as described
in '

To replace main PCB'.

• Pull off pump connector and earth lead.
• Pull out retaining clip from telescopic pump out-
let connection and slide connection upwards to
release from pump.
• Undo and remove two fixing screws and remove
pump retaining bracket from front of pump.
• Grasp pump body, lift upward to disengage from
reversing valve and turn pump to right. Remove
pump by pulling forward and over reversing valve
assembly.
• Discard old pump inlet 'O' ring.
• Apply silicone grease to new 'O' ring supplied,
and fit onto inlet connection on replacement
pump.
• Fit replacement pump in reverse order to re-
moval.

Note: 

Apply silicone grease to pump outlet con-

nection 'O' ring before assembly.
• Refit pump electrical connection.
• Open isolating valves on flow and return connec-
tions, refill, vent and pressurise boiler. Check for leaks.

To replace temperature/pressure gauge

• Drain down heating circuit of boiler only as de-
scribed in '

To replace pump'.

• Undo and remove screw securing pressure
gauge capillary to front section, 

see diagram 31.

• Carefully pull capillary from front section.
• Undo and remove two screws securing tempera-
ture/pressure gauge to lower front panel and re-
move gauge.
• Fit replacement gauge in reverse order to
removal.

REPLACEMENT OF PARTS

• Fit capillary of new gauge to front section using
new 'O' ring supplied.
• Open isolating valves on flow and return con-
nections, refill, vent and pressurise boiler. Check for
leaks.

To replace reversing valve assembly

• Remove temperature/pressure gauge capillary
as described previously.
• Remove pump as described previously.
• Remove microswitch assembly as described pre-
viously.
• Remove retaining clip from LHS pipe connection
on front section of valve and disengage pipe.
• Unscrew and disconnect heating flow (centre)
connection at fixing jig.
• Remove retaining clip from heating flow pipe
connection on right of front section.
• Remove flow pipe from boiler.
• Unscrew and disconnect heating return (left
hand) connection at fixing jig.
• Remove retaining clip from expansion vessel pipe
connection at rear of reversing valve assembly and
disengage pipe, pushing pipe back and out of re-
versing valve.
• Undo and remove large screw holding water
valve to back plate of reversing valve assembly,

see diagram 32.

Diagram 31

Cla 007

Des 054

Diagram 32

Summary of Contents for THEMA F 23 E

Page 1: ...1 Heating and hot water for the professionals 01773 828100 IN WARRANTY TECHNICAL HELPLINE 01773 828400 THIS IS A CAT II2H3 APPLIANCE THEMA F Installation and Servicing Instructions...

Page 2: ...essure switch 19 Spark generator 19 Main printed circuit board 19 Ignition printed circuit board 20 Pump 20 Temperature Pressure gauge 20 Reversing valve assembly 20 Reversing valve front section 21 L...

Page 3: ...ec tion Alternatively the boiler is designed to allow the flue system to be connected to the top of the boiler top outlet flue connection Refer to the flue fitting instructions Electrical components h...

Page 4: ...eating output automatically variable from kW 8 9 8 9 8 9 BTU H 30 000 30 000 30 000 to kW 23 3 18 5 23 3 BTU H 80 000 63 000 80 000 Efficiency 91 5 90 5 91 5 Heating adjustment 38 C to 90 C Expansion...

Page 5: ...799 51214 54628 58042 61456 64871 68285 71699 75113 79552 Heat input kW 11 9 13 2 14 4 15 7 16 9 18 1 19 2 20 4 21 5 22 7 23 8 24 9 26 0 26 9 28 3 Btu h 40678 45130 49332 53481 57579 61627 65626 69575...

Page 6: ...ressure switch 24 Gas cock A Heating return B Cold water inlet C Heating flow D Domestic hot water flow E Gas supply THEMA F 23 E 22 23 A C E 4 16 17 19 6 8 9 10 11 13 12 21 3 14 24 3 Ignition module...

Page 7: ...to right the fixing jig comprises A Heating return with isolating valve m C Heating flow with isolating valve q drain screw r and safety valve s E Gas service cock 1 2 5 7 r p q 25 23 113 23 s A C E m...

Page 8: ...made for filling the system at low level The use of a WRC approved filling loop is strongly recommended connected as shown in diagram 6 Safety valve discharge WARNING It must not discharge above an en...

Page 9: ...talled immediately protect the various couplings to prevent any ingress of foreign materials e g plaster paint etc Terminal position The minimum acceptable spacings from the ter minal to obstructions...

Page 10: ...age boiler upper part onto the hook see dia gram 9 Allow the boiler to seat down onto support plate see diagram 10 Fit filter and washers strictly adhering to the se quential order and directions show...

Page 11: ...aged Calculation of flue cutting lengths Measure wall thickness e mm For side flues measure distance from inside face of side wall to centre line of flue and subtract 176 mm for right hand flue or sub...

Page 12: ...e outer end of pipe A see diagram 16 Fit outer pipe A into wall with groove to the outside Pull pipe inwards to bring rubber sealing collar hard up against external wall see diagram16 Fit internal pla...

Page 13: ...ue and subtract 205 mm for both right and left hand flues to get dimension a mm Refer to table 1 for cutting lengths of both inner and outer flue pipes for each of the various flue options available I...

Page 14: ...arning This appliance must be wired in accord ance with these instructions Any fault arising from incorrect wiring cannot be put right under the terms of the Saunier Duval guarantee Time clock A mecha...

Page 15: ...wing the instructions given in the User Instruc tions set boiler to run in central heating mode Set boiler thermostat for maximum temperature and check that any external controls if fitted are calling...

Page 16: ...inue to run The boiler will be ready to operate when the fault has been cleared In case of power supply failure The boiler no longer operates As soon as power supply is restored the boiler will be aut...

Page 17: ...ss The THEMA F 23 E has a built in bypass This must be adjusted according to the requirements of the sys tem refer to the flow rate pressure curve diagram 3 The boiler is supplied with the built in by...

Page 18: ...e insulation material on inside faces of combustion chamber Cleaning the burner Pull off leads to ignition electrode Pull off lead to flame sense electrode Unscrew and remove screw holding earth lead...

Page 19: ...rnal controls connector from mount ing bracket Undo two screws securing microswitch assembly to reversing valve assembly see diagram 29 Remove microswitch assembly from reversing valve Fit replacement...

Page 20: ...onto inlet connection on replacement pump Fit replacement pump in reverse order to re moval Note Apply silicone grease to pump outlet con nection O ring before assembly Refit pump electrical connecti...

Page 21: ...it U shaped retaining clip Note Use bypass valve fitted to original front sec tion for guidance Fit replacement front section with gasket to rear section Locate front plate and replace six fixing scre...

Page 22: ...f water valve When clip is fitted check con nection by pushing pipe back away from water valve Refit telescopic connecting pipe to inlet of wa ter valve after applying silicone grease to O ring Fit re...

Page 23: ...mini mum clearance of 400mm on one side of the boiler and that no vertical pipework passes between boiler and wall on that side Drain down the heating circuit of the boiler only as described in To rep...

Page 24: ...and Inspection Pull off lead from flame sense electrode Unscrew and remove screw holding earth lead to flame sense electrode Unscrew and remove screw holding flame sense electrode onto burner Fit rep...

Page 25: ...14 8 14 9 6 8 6 6 6 4 6 2 6 3 2 2 2 1 9 1 9 2 8 4 8 3 8 2 8 1 12 1 12 2 P THEMA F 23 E PCB N L P Ex EV1 EV TRA 6 14 6 15 6 11 CTN TH V3V TA K5 K4 Pr FL Ra FA Al 6 12 6 9 13 2 13 3 13 1 13 4 14 1 14 2...

Page 26: ...a logical step by step pro cedure starting at the beginning of the appropriate fault finding chart WARNING Always isolate the boiler from the electri cal supply before carrying out any electrical rep...

Page 27: ...NOT RUNNING FAN NOT RUNNING Replace main PCB YES CHART 4 NO NO Is pump jammed Replace pump motor NO Free pump Replace main PCB Is fan jammed Replace fan NO SPARE PARTS When ordering spare parts quote...

Page 28: ...28 108198 B 06 98...