Maintenance
WP
33L_
BA_K
1_1
2_en_
08.
fm
51
8.2 Maintenance safety
Before Servicing
1. Disconnect the power supply to the compressor.
2. Post sign “Caution Maintenance Work!” at the power supply.
Danger!
Only authorised persons are permitted to Service and make ad-
justments to the Sauer Compressor!
Danger!
Risk of injury from hot surfaces!
Let compressor cool down after turning OFF.
Danger!
Risk of injury from pressurised compressor components!
Check the pressure gauges before servicing to ensure the com-
pressor is completely relieved of pressure.
Danger!
High voltage! Danger to life!
– Never assume that a circuit is de-energised – always check
for your own safety!
– The main switch is energised, even when it is turned off.
– Components being worked on should only be energised if this
is explicitly specified.
Danger!
Danger of death from missing safety devices and missing isola-
ting protection devices!
Reinstall all safety devices and isolating protection devices after
Servicing. This also applies to electrical protection devices (e.g.
earth wires).
Summary of Contents for WP 33 L
Page 4: ...Zertifikate_en_0 fm Genuine Sauer spare parts certified safety SPECIMEN...
Page 85: ...S a u e r C o m p r e s s o r Type WP 33 L Spare Parts List...
Page 89: ...Spare Parts List WP33L_ET_en_08 fm E 5...
Page 94: ...E 10 WP33L_ET_en_08 fm 060 315 Compressor WP33L 100 21 17 22 1 19 20 11 12 2...
Page 96: ...E 12 WP33L_ET_en_08 fm 060 315 Compressor WP33L 100...
Page 100: ...E 16 WP33L_ET_en_08 fm 061 383 Dipstick 3 1...
Page 102: ...E 18 WP33L_ET_en_08 fm 060 317 Crankshaft 4 5 2 6 3 7 5 4 1...
Page 104: ...E 20 WP33L_ET_en_08 fm 060 280 Connecting rod 1st stage 1 4 7 5 6 50 Nm...
Page 106: ...E 22 WP33L_ET_en_08 fm 060 283 Connecting rod 2nd stage 1 4 7 5 6 50 Nm...
Page 108: ...E 24 WP33L_ET_en_08 fm 034 989 Piston 1st stage 7 3 4 5 6 2 1...
Page 110: ...E 26 WP33L_ET_en_08 fm 060 319 Piston 2nd stage 7 3 4 5 1 6 2...
Page 112: ...E 28 WP33L_ET_en_08 fm 068 628 Cylinder with head and valve 1st stage 3 2 4 5 1...
Page 114: ...E 30 WP33L_ET_en_08 fm 068 615 Cylinder with head and valve 2nd stage 2 3 4 1...
Page 118: ...E 34 WP33L_ET_en_08 fm 060 328 Crankcase vent 3 1 2 5 6 060 328 1st stage...
Page 120: ...E 36 WP33L_ET_en_08 fm 030 915 Safety valve 1st stage 1 3...
Page 122: ...E 38 WP33L_ET_en_08 fm 030 752 Safety valve 2nd stage 1 3...
Page 124: ...E 40 WP33L_ET_en_08 fm 060 440 Air pressure piping 7 8 4 6 2 4 6 9 1 5 10...
Page 126: ...E 42 WP33L_ET_en_08 fm 060 312 Separator 2 7 8 1 4 6 3 8...
Page 128: ...E 44 WP33L_ET_en_08 fm 035 010 Pressure gauge 1 2...
Page 130: ...E 46 WP33L_ET_en_08 fm 060 354 Automatic drainage system 3 1 4 5...
Page 132: ...E 48 WP33L_ET_en_08 fm 060 589 Resilient mounts 3 5 1 4 2 6 4 2 6...
Page 134: ...E 50 WP33L_ET_en_08 fm 065 568 Resilient mounts 3 5 1 4 2 6 4 2 6...
Page 136: ...E 52 WP33L_ET_en_08 fm 061 001 Hose line 1 2...
Page 138: ...E 54 WP33L_ET_en_08 fm Flexible coupling 1 2 3 Compressor Motor...
Page 140: ...E 56 WP33L_ET_en_08 fm Flexible coupling 1 2 3 Compressor Motor...
Page 142: ...E 58 WP33L_ET_en_08 fm...