
Step 14
427163
www.sauder.com/service
Page 20
E
B
å
Separate the EXTENSION SLIDES (40NC) from the EXTENSION RAILS (40NA) as shown in the
upper diagram below. Be prepared, the parts are greasy.
å
Fasten the EXTENSION RAILS (40NA) to the LEFT UPRIGHT (B) and LEFT END (E). Use eight
SILVER 1/2" FLAT HEAD SCREWS (128S) through holes #1 and #3.
å
NOTE: For each EXTENSION RAIL, turn a SCREW into the hole shown in the enlarged diagram.
Then, slide the inner cartridge of the EXTENSION RAIL in to find the other hole that lines up with
the hole in the UPRIGHT and END. Turn a SCREW into this hole.
å
NOTE: The EXTENSION SLIDES will be used later for the DRAWERS.
Open end
Open end
Push the black lever in and pull the SLIDE from the RAIL.
40NA
40NC
3
2
1
1
2
3
4
4
3
2
1
4
1
2
3
4
SILVER 1/2" FLAT HEAD SCREW
(8 used for the RAILS)
128S