
Equipment Supplied
– Balance with protective flip-down cover
– Weighing pan
– Plug-in AC adapter
Additional equipment with models AY612, AY412,
AY212, AY711, AY511:
– Calibration weight
Additional equipment with models AY303, AY123:
– Calibration weight
– Round glass draft shield
– Level indicator and adjustable feet
Storage
$
Do not stack more than 3 balances on top of one
another at a time.
Installation
Choose a location that is not subject to the
following negative influences:
– Heat (heater or direct sunlight)
– Drafts from open windows and doors
– Extreme vibrations during weighing
– Excessive moisture
Setting Up the Balance
§
Place the components on the balance in the
following order:
– Reversible round weighing pan
– Round glass draft shield on models AY303, AY123
!
Do not use as an “in-use“ cover!
4
4
Getting Started
PK Elektronik Vertriebs GmbH, E-Mail: [email protected], Internet: www.pkelektronik.com