Sapcon SLA 122 Instruction Manual Download Page 5

User Manual & Datasheet V 2.1

and equi-phase relation between the sense and shield waveforms a high degree of immunity to probe coating and

build-up achieved. The probe head is of cast aluminium construction and is fitted on the probe extension, away from
heat. It is provided with a suitable mounting arrangement of the screwed or flanged type (as per order).

ELECTRONIC INSERT:

The electronic insert can either be directly mounted in probe housing or remotely in-

stalled in a separate housing. The electronic insert comprises of an RF Oscillator, Detector and Coat Immunizing
circuitry all encased in a plastic housing and potted with epoxy resin. Built-in terminals on electronic insert facilitate
interconnections. The Insert is further housed in a cast aluminium housing provided with a suitable entry and houses a
high voltage discharge device (Optional).

EVALUATION UNIT:

The evaluation unit consists of a step down transformer, rectifier, voltage regulator, os-

cillator, probe immunizing circuitry, set point adjusting capacitor, relay driving circuitry, fail-safe selection LED Indicator
and Relay. In case of time delay model, a separate timing mode selection switch and pot is provided for delay setting.
The electronics along with interconnecting terminals is assembled on a glass epoxy PCB heavily lacquered for rendering
it immune to moisture, dust and fungus.

The card in turn is mounted in a cast aluminium weather proof housing, stoved enamel painted & provided with 3 nos.

of cable entries. The measuring electrode and shield are connected to a radio frequency source. Due to the geometry of
construction and immuno coat circuitry, RF current does not flow between the measuring electrode and shield. Current
can, however, flow between the shield and mounting (ground) which being out of the measuring circuit does not effect
indication. The only path left for the current to flow through is the admittance path via the material to the vessel wall
(ground). This being the only path of interest, the system gives a reliable indication of level.

Figure 3: System Diagram

Sapcon Instruments Pvt.Ltd.

R

5

Summary of Contents for SLA 122

Page 1: ...SLA SERIES Admittance Level Limit Switch INSTRUCTION MANUAL Version 2 1 ...

Page 2: ...cifications 6 8 Electronic Insert ICA 3000A 7 9 Probe 7 10 Installation and Handling Guidelines 8 11 Connection 8 12 Calibration 9 13 Calibration procedure For Fail Safe High 9 14 Calibration Procedure For Fail Safe Low 10 15 Customer Support 10 List of Figures 1 SLA 4 2 Description of Parts 4 3 System Diagram 5 List of Tables 1 Electrical Specifications 6 2 Mechanical Specifications 6 3 Electroni...

Page 3: ...l instrument housing in terms of dimensions color and design Please refer to GA drawings for dimensional details Values of performance described in this manual were obtained under ideal testing conditions Hence they may differ under industrial environment and settings General Instructions Instrument shouldn t block the material filling inlet Secure the cover of housing tightly Tighten the cable gl...

Page 4: ...rial When all the parameters that affect the admittance value are kept constant then its value changes only due to the difference in material level This change after amplification is used to operate a relay the output contacts of which are used for signaling or control 3 Measuring System The complete admittance system comprises of the fol lowing Probe of special construction immuno coat system Ele...

Page 5: ...e regulator os cillator probe immunizing circuitry set point adjusting capacitor relay driving circuitry fail safe selection LED Indicator and Relay In case of time delay model a separate timing mode selection switch and pot is provided for delay setting The electronics along with interconnecting terminals is assembled on a glass epoxy PCB heavily lacquered for rendering it immune to moisture dust...

Page 6: ...lectable Time Delay Setting 1 25 sec For Covered and Uncovered Both Table 1 Electrical Specifications 7 2 Mechanical Specifications Please refer to Table 2 for Mechanical Specifications PARAMETER VALUE Housing RB Cast Aluminium weather proof powder coated paint IP 65 SQP Cast Aluminium weather proof powder coated paint IP 65 Square Probe Mounted FP2A Cast Aluminium weather flame proof powder coate...

Page 7: ...ARAMETER VALUE Housing RB Cast Aluminium weather proof powder coated paint IP 65 SQP Cast Aluminium weather proof powder coated paint IP 65 Square Probe Mounted FP2A Cast Aluminium weather flame proof powder coated paint suitable for gas group IIA IIB as per IS 2148 SNSR Pressure Die Cast Aluminium weather proof IP 66 Cable Entry 1 2 3 4 BSP NPT Brass Cable Gland Type Single Double Compression Gla...

Page 8: ... temperature exceed ing 60 C Through the instrument can be installed outdoors it should never be subjected to direct sun rays Preferably a sun shade should be provided 11 Connection ELECTRONIC INSERT ICA 3000A Ordinary three core cable of core cross section 1 5mm2 re sistance per core less than 25 ohms can be used to connect the Electronic Insert to the Evaluation Unit since only DC proportional t...

Page 9: ...een LED does not go ON select next higher range i e range III LED would definitely go ON d Turn sensitivity pot anticlockwise until red LED goes ON Again turn sensitivity pot slowly clockwise until green LED just goes ON e From this accurate switch point position turn the pot a few degrees clockwise Green LED remains ON thereby setting the sensitivity to as table switching position f The instrumen...

Page 10: ...ptying cycle 15 Customer Support Thank you for going through the instructions given in this manual To further ease the process of installation and use we have developed special demo videos which are hosted on YouTube Sapcon s YouTube channel SAPCON INSTRUMENTS lists all these videos https goo gl dnxfcz Should you require further information regarding in stallation use or working of the instrument ...

Reviews: