17
PJ NETWORK MANAGER
OWNER'S MANUAL
Setting up default setting
The monitoring information and e-mail information can be set up by the procedure below.
1
Select
System default setting
from
System
menu. The setting window will appear.
2
Switch by clicking
Monitoring information
or
E-mail information
tab for each setting.
Monitoring information
Items
Description
Monitoring interval
................Sets up the interval of the polling in minute unit. (1 to 99 minutes can be set)
Temperature unit
.....................
Sets up the display temperature unit Centigrade or Fahrenheit.
Event reception process
..........Sets up the treatment when the event (ALERT, TRAP, SYSERR) happens on the target.
For further information, refer to the item "About event treatment" (
p.26).
P
Sound warning alarm
P
Send e-mail
P
Display warning dialog
Monitoring information
Setting up default setting
Summary of Contents for PLC-XU301
Page 79: ... SANYO Electric Co Ltd ...
Page 89: ...10 Chapter 1 Preparation ...
Page 90: ...ENGLISH 11 ENGLISH Chapter 2 Setup Procedures 2 Describes how to configure the network ...
Page 137: ...NETWORK OWNER S MANUAL SO KD5AC SANYO Electric Co Ltd ...
Page 142: ...5 PJ NETWORK MANAGER OWNER S MANUAL Chapter 2 Set up 2 ...
Page 144: ...7 PJ NETWORK MANAGER OWNER S MANUAL Chapter 3 Basic Operation 3 ...
Page 169: ...PM KF5AC PJ NETWORK MANAGER OWNER S MANUAL FOR WINDOWS SANYO Electric Co Ltd ...