Perform a power outage test to confirm whether the UPS is working properly. Be sure to perform this test
prior to connecting the load devices.
Check that the “Green INPUT”
stops blinking and remains lit, and
then proceed to step
②
.
After “Green DOUBLE CONVERSION”
lights, it might go off depending on the input
power condition.
When the UPS is working properly, the buzzer sound and LED state will be as indicated in steps
③
and
④
.
Hold for 1 second.
①
Set
MAIN SW
on the back panel of the UPS to “ON”.
③
Set
MAIN SW
to “OFF”.
Step
①
is not necessary if the
procedure in §9.2 “UPS Charge”
was performed beforehand.
Tip
②
Press and hold
for at least 1 second.
Buzzer
2 beeps..., 2 beeps..., repeated
LEDs
Green INPUT
Blinking
Green INV.ON/STAND BY Lit
Green OUTPUT
Lit
LEDs
Green INPUT
Blinking
Green INV.ON/STAND BY Off
Green OUTPUT
Off
↓
Green INPUT
Lit
Green INV.ON/STAND BY Off
Green OUTPUT
Off
Buzzer
Musical trill
LEDs
Green INPUT
Lit
Green INV.ON/STAND BY Lit
Green OUTPUT
Lit
Green DOUBLE CONVERSION Lit
OUTPUT max.700W 10A
INPUT
MAIN SW
EXT.
EXT.
BATT
BATT
Set to “ON”.
OUTPUT max.700W 10A
INPUT
MAIN SW
EXT.
EXT.
BATT
BATT
Set to “OFF”.