background image

SANY CRAWLER CRANE

SCC2600A

43 

42 

Luffing jib load CHARTS

SC

C

26

00

A L

uf

fin

g J

ib L

oa

d C

ha

rt

s (

W

ith

ou

t J

ib H

ea

d P

ul

le

y B

loc

k)

B

oo

m l

en

gt

h (

m

)

26

B

oo

m l

en

gt

h (

m

)

Ji

b l

en

gt

h (

m

)

45

48

51

54

Ji

b l

en

gt

h (

m

)

   

      B

oo

m a

ng

le (

°

)          

R

ad

ius

(m

)

88

85

80

75

70

65

88

85

80

75

70

65

88

85

80

75

70

65

88

85

80

75

70

65

Bo

om

 a

ng

le(

°

)            

              R

ad

ius

(m

)

10

10

12

12

14

14

16

48

.2 

16

18

47.

42

.8 

38

.4 

31.

18

20

47.

46

.7

 

42

.1

 

41

.9

 

37.

31.

20

22

43

.7

 

45

.9 

41

.6

 

41

.3

 

37.

37.

31

.1

 

30

.9 

22

24

39

.9 

42

.1

 

39

.4 

40

.8 

36

.8 

36

.6 

30

.6 

30

.4 

24

26

36

.6 

38

.8 

37.

36

.1

 

38

.2 

36

.0 

36

.1

 

30

.2 

30

.1

 

26

28

33

.6 

35

.9 

34

.5 

33

.5 

35

.4 

33

.9 

33

.2 

34

.8 

33

.4 

29

.8 

29

.6 

28

30

31.

33

.4 

32

.0 

31

.1

 

32

.9 

31.

30

.9 

32

.4 

31

.1

 

29

.3 

29

.3 

28

.5 

30

32

29

.1

 

31

.1

 

30

.0 

28

.7

 

28

.8 

30

.7

 

29

.4 

28

.7

 

30

.2 

29

.0 

28

.4 

29

.0 

28

.2 

32

34

27.

28

.9 

27.

26

.8 

27.

28

.7

 

27.

26

.5 

26

.9 

28

.3 

27.

25

.9 

26

.4 

27.

26

.7

 

34

36

24

.7

 

26

.9 

25

.9 

24

.9 

25

.4 

26

.8 

25

.7

 

24

.7

 

25

.2 

26

.6 

25

.5 

24

.4 

23.

26

.2 

25

.1

 

24

.0 

36

38

22

.0 

25

.1

 

24

.2 

23.

23.

23.

24

.9 

24

.0 

23.

22

.1

 

23.

24

.8 

23.

22

.8 

21.

24

.3 

23.

22

.6 

38

40

19

.4

 

22

.1

 

22

.6 

21.

21.

20

.6 

23.

22

.4 

21.

20

.6 

21.

23.

22

.2 

21.

20

.3 

19

.3

 

21.

22

.1

 

21.

40

42

15

.6

 

19

.6

 

21.

20

.3 

20

.2 

18

.6

 

18

.5

 

21.

21.

20

.2 

19

.3

 

19

.4

 

21.

20

.8 

19

.9

 

19

.1

 

17.

19

.6

 

20

.7

 

19

.8

 

18

.9

 

42

44

13

.0

 

15

.4

 

19

.9

 

19

.1

 

18

.9

 

17.

16

.4

 

18

.6

 

19

.7

 

18

.9

 

18

.1

 

17.

17.

19

.9

 

19

.5

 

18

.7

 

17.

15

.7

 

17.

19

.4

 

18

.5

 

17.

44

46

10

.4

 

12

.8

 

17.

18

.0

 

17.

16

.5

 

12

.2

 

14

.7

 

18

.6

 

17.

17.

16

.3

 

15

.6

 

17.

18

.4

 

17.

16

.8

 

16

.0

 

14

.1

 

15

.9

 

18

.3

 

17.

16

.7

 

46

48

14

.3

 

16

.9

 

16

.7

 

15

.6

 

10

.0

 

12

.2

 

17.

16

.8

 

16

.0

 

15

.3

 

11

.5

 

15

.7

 

17.

16

.6

 

15

.8

 

15

.1

 

12

.6

 

14

.3

 

17.

16

.5

 

15

.7

 

14

.9

 

48

50

16

.0

 

15

.8

 

14

.7

 

9.

16

.6

 

15

.8

 

15

.1

 

14

.5

 

9.

11

.5

 

16

.4

 

15

.7

 

14

.9

 

14

.2

 

11

.3

 

13

.0

 

15

.8

 

15

.5

 

14

.8

 

14

.0

 

50

52

15

.1

 

15

.0

 

13

.9

 

15

.7

 

15

.0

 

14

.3

 

13

.7

 

9.

13

.1

 

14

.8

 

14

.1

 

13

.4

 

7.

11

.5

 

14

.2

 

14

.7

 

14

.0

 

13

.3

 

52

54

14

.1

 

13

.1

 

14

.2

 

13

.6

 

13

.0

 

10

.7

 

14

.0

 

13

.3

 

12

.7

 

5.

7.

12

.8

 

13

.9

 

13

.2

 

12

.5

 

54

56

12

.4

 

12

.9

 

12

.2

 

13

.2

 

12

.6

 

12

.0

 

5.

8.

13

.1

 

12

.5

 

11

.9

 

56

58

11

.6

 

12

.5

 

12

.0

 

11

.3

 

6.

9.

11

.9

 

11

.3

 

58

60

11

.3

 

10

.8

 

7.

11

.3

 

10

.6

 

60

62

10

.3

 

10

.6

 

10

.1

 

62

64

9.

64

66

66

68

68

Luffing jib load CHARTS

SC

C

26

00

A L

uf

fin

g J

ib L

oa

d C

ha

rt

s (

W

ith

ou

t J

ib H

ea

d P

ul

le

y B

loc

k)

B

oo

m l

en

gt

h (

m

26

B

oo

m l

en

gt

h (

m

Ji

b l

en

gt

h (

m

)

57

60

63

Ji

b l

en

gt

h (

m

   

      B

oo

m a

ng

le (

°

)          

R

ad

ius

(m

)

88

85

80

75

70

65

88

85

80

75

70

65

88

85

80

75

70

65

Bo

om

 a

ng

le(

°

)            

                     R

ad

ius

(m

10

10

12

12

14

14

16

16

18

18

20

31.

28

.2 

20

22

30

.5 

27.

25

.3 

22

24

30

.1

 

29

.9 

27.

27.

24

.9 

24

26

29

.5 

29

.4 

26

.9 

26

.7

 

24

.6 

24

.5 

26

28

29

.1

 

29

.0 

26

.6 

26

.5 

24

.1

 

24

.0 

28

30

28

.8 

28

.5 

28

.0 

26

.1

 

26

.0 

23.

23.

30

32

28

.3 

28

.3 

27.

25

.7

 

25

.7

 

25

.2 

23.

23.

32

34

26

.6 

27.

26

.3 

25

.3 

25

.2 

24

.8 

23.

23.

22

.6 

34

36

24

.9 

25

.7

 

24

.7

 

24

.6 

24

.8 

24

.2 

22

.6 

22

.6 

22

.2 

36

38

23.

24

.2 

23.

22

.1

 

23.

23.

22

.8 

21.

22

.2 

22

.2 

21.

38

40

21.

22

.9 

21.

20

.8 

21.

22

.5 

21.

20

.4 

21.

21.

21.

20

.0 

40

42

20

.5 

21.

20

.4 

19

.5

 

20

.5 

21.

20

.3 

19

.3

 

20

.3 

20

.8 

19

.8

 

18

.9

 

42

44

19

.4

 

20

.1

 

19

.2

 

18

.4

 

17.

19

.4

 

19

.9

 

19

.0

 

18

.1

 

19

.3

 

19

.7

 

18

.7

 

17.

44

46

17.

18

.9

 

18

.1

 

17.

16

.4

 

18

.3

 

18

.7

 

17.

17.

16

.2

 

18

.1

 

18

.5

 

17.

16

.8

 

46

48

15

.8

 

17.

17.

16

.2

 

15

.4

 

16

.6

 

17.

16

.8

 

16

.0

 

15

.2

 

17.

17.

16

.6

 

15

.8

 

14

.9

 

48

50

14

.2

 

16

.0

 

16

.0

 

15

.3

 

14

.6

 

13

.9

 

14

.9

 

16

.7

 

15

.8

 

15

.1

 

14

.3

 

15

.6

 

16

.5

 

15

.7

 

14

.9

 

14

.1

 

50

52

10

.2

 

14

.5

 

15

.1

 

14

.4

 

13

.8

 

13

.1

 

13

.4

 

15

.2

 

14

.9

 

14

.2

 

13

.5

 

12

.8

 

14

.1

 

15

.5

 

14

.8

 

14

.0

 

13

.3

 

52

54

8.

10

.2

 

14

.3

 

13

.7

 

13

.0

 

12

.3

 

12

.1

 

13

.8

 

14

.1

 

13

.5

 

12

.8

 

12

.1

 

12

.9

 

14

.5

 

14

.0

 

13

.2

 

12

.5

 

11

.9

 

54

56

6.

8.

13

.6

 

13

.0

 

12

.2

 

11

.6

 

7.

9.

13

.4

 

12

.8

 

12

.1

 

11

.4

 

11

.5

 

13

.1

 

13

.2

 

12

.5

 

11

.9

 

11

.2

 

56

58

6.

12

.9

 

12

.2

 

11

.6

 

11

.0

 

6.

7.

12

.7

 

12

.1

 

11

.4

 

10

.8

 

7.

11

.8

 

12

.5

 

11

.9

 

11

.2

 

10

.5

 

58

60

12

.2

 

11

.6

 

11

.0

 

10

.4

 

4.

6.

8.

11

.4

 

10

.8

 

10

.3

 

5.

7.

11

.9

 

11

.3

 

10

.6

 

10

.0

 

60

62

11

.6

 

11

.0

 

10

.4

 

9.

7.

10

.9

 

10

.3

 

9.7

 

4.

5.

7.

10

.6

 

10

.0

 

9.

62

64

10

.4

 

9.

9.

5.

10

.3

 

9.7

 

9.

4.

6.

10

.1

 

9.

8.

64

66

9.

8.

9.

9.

8.

5.

9.

9.

8.

66

68

8.

8.

8.

9.

8.

8.

68

70

7.

8.

8.

7.

70

72

7.

7.

72

74

6.

8

74

N

ot

es

: 1

. T

he a

ct

ua

l w

ei

gh

t i

s a v

al

ue t

ha

t t

he r

at

ed w

ei

gh

t i

n t

hi

s t

ab

le i

s s

ub

tra

ct

ed b

y t

he w

ei

gh

ts o

f t

he h

oo

ks

, h

an

ge

rs

, a

nd w

ire r

op

es w

in

di

ng o

n t

he h

oo

ks a

nd o

n t

he b

oo

m h

ea

d.

 

2. T

he r

at

ed l

oa

d i

n t

hi

s t

ab

le i

s m

ea

su

re

d u

nd

er t

he c

on

di

tio

n t

ha

t t

he h

ea

vy o

bj

ec

t i

s l

ift

ed s

lo

w

ly a

nd s

ta

bl

y f

ro

m t

he l

ev

el a

nd h

ar

d s

oi

l g

ro

un

d.

N

ot

es

: 1

. T

he a

ct

ua

l w

ei

gh

t i

s a v

al

ue t

ha

t t

he r

at

ed w

ei

gh

t i

n t

hi

s t

ab

le i

s s

ub

tra

ct

ed b

y t

he w

ei

gh

ts o

f t

he h

oo

ks

, h

an

ge

rs

, a

nd w

ire r

op

es w

in

di

ng o

n t

he h

oo

ks a

nd o

n t

he b

oo

m h

ea

d.

 

2. T

he r

at

ed l

oa

d i

n t

hi

s t

ab

le i

s m

ea

su

re

d u

nd

er t

he c

on

di

tio

n t

ha

t t

he h

ea

vy o

bj

ec

t i

s l

ift

ed s

lo

w

ly a

nd s

ta

bl

y f

ro

m t

he l

ev

el a

nd h

ar

d s

oi

l g

ro

un

d.

Un

it

(t

)

Un

it

(t

)

Summary of Contents for SCC 2600A

Page 1: ...SCC2600A SCC 2600A ...

Page 2: ...ations Superstructure Undercarriage Operation Devices Safety Devices Operating Condition Combination Operating Condition Combination H Operating Condition Fixed Jib Combination Luffing Jib Combination Shield Operating Condition Load Charts P2 P16 P23 02 Outline Dimensions 03 Main Technical Features 04 Main Performance Data 05 Transport Dimensions 10 Transporting scheme 12 Assembly and disassembly d...

Page 3: ...y maintenance no more than 2h person to repair GPS remote monitoring system is optional for maintenance and management 7 Powerful Lifting Capacity The maximum boom lifting moment is 183 8t 8m 1470 4t m and the longest boom length is 86m the maximum lifting capacity of luffing jib is 62 5t 18m 1125t m and the longest boom combination length is 62 m 63m 8 High Efficient Self Handling Technology A butt...

Page 4: ...ty t 260 Maximum rated lifting moment t m 1470 4 Boom length m 20 86 Boom luffing angle 30 85 Fix jib operating jib Longest boom longest fixed jib m 62 42 Fixed jib offset angle 10 30 Heavy fixed jib operating condition Boom fixed jib shield operating condition m 20 12 Angle between boom and jib 20 Luffing jib operating condition Maximum lifting moment t m 62 5 18 1125 Longest boom longest lufffing jib...

Page 5: ...th 2 12m Height 1 91m Weight 1 95t Boom Extension 1 Length 2 2m Width 0 95m Height 1 44m Weight 0 42t Jib Base Luffing Front and Rear Masts 1 Length 11 49m Width 2 11m Height 3 26m Weight 5 5 t 6m Fixed Jib Insert 1 Length 6 11m Width 1 50m Height 1 42m Weight 0 75t 11 5m Fixed Jib Insert 2 Length 11 67m Width 1 50m Height 1 42m Weight 1 3 t Fixed Jib Base and Mast 1 Length 6 70m Width 1 42m Heigh...

Page 6: ...eight 2 93m Weight 5 2t 160t Hook 1 Length 0 59m Width 1 02m Height 2 64m Weight 3 2t 100t Hook 1 Length 0 51m Width 1 02m Height 2 48m Weight 2 3t 50t Hook 1 Length 0 45m Width 1 02m Height 2 30m Weight 1 7t H H H H H W L L L L L L W W W W H L W Notes 1 The transport dimensions of the parts are marked on schematic diagrams but not drawn by scale the dimensions indicated are the design values excl...

Page 7: ...27 18018 18018 14630 14630 14630 14630 2840 6480 8500 13320 13115 3450 18341 1000 2400 1060 1060 1500 1500 1500 1500 1000 500 1000 1000 1000 1000 1840 3800 3860 1023 Platform lorry 20 14630 Rated load 20t Transport part Basic crane Transport weight 13 5t Quantity 1 Platform lorry 20 14630 Rated load 20t Transport part Central ballast frame 1 12m luffing jib intermediate section 1 and 16T ball hook ...

Page 8: ...sassembly diagram 1 Basic crane self assembly 2 Track frame self assembly 3 Counterweight self assembly 4 Boom jib base self assembly 1 Basic boom installation Main Auxiliary winch wire rope 2 Jib frame installation under luffing jib operating condition Boom frame installation diagram ...

Page 9: ...CRAWLER CRANE SCC2600A 15 14 15 SCC2600A Superstructure 16 Undercarriage 18 Operation Devices 19 Safety Devices 20 3 Jib frame installation under fixed jib operating condition Assembly and disassembly diagram ...

Page 10: ...ter of wire rope 28mm Length of boom luffing wire rope 310m Rated single line pull 17t 5 Boom Luffing Device The boom luffing drum is equipped with the ratchet pawl locking device to ensure the parking safety of boom under non working state NO 4 Jib luffing device Outermost working layer rope speed 0 72m min Diameter of wire rope 20mm Length of jib luffing wire rope 410m Rated single line pull 8t 6 Jib...

Page 11: ...section 3m 1 intermediate section 6m 1 and intermediate section 12m 5 The boom length can be variable between the basic boom 20m and longest length 86m which is increased by 3m The 2 0m boom extension can be installed not only on the boom head but also on the luffing jib head 2 Fixed Jib The main chord pipe is made of high strength material And the boom frame is of lattice the space truss structure...

Page 12: ...ture with the larger compression and amount the greater back stop force The maximum output force of back stop cylinder is 38t There is a pair of mechanical back stop device on the rear mast of luffing jib to prevent the mast overturn roll backward and to tension the rear mast pendant bar If the angle between jib and boom is too small the cylinder back stop device can prevent it overturn roll backwa...

Page 13: ...Operating Condition 28 Fixed Jib Combination 38 Luffing Jib Combination 56 Shield Operating Condition Load Charts Operating condition combination 21m 63m 26m 62m 29m 62m 13m 42m 20m 86m H operating condition H Fixed jib operating condition FJ Luffing jib operating condition LJ Shield operating condition FJh 20m 12m ...

Page 14: ...5 86 1 1 5 Boom head 1m Transitional insert 6m 12m boom insert 5 pieces 6m boom insert 1 pieces 3m boom insert 1 pieces Boom base 10m 64 60 68 72 76 92 96 84 88 80 56 48 52 44 40 36 28 32 20 24 12 16 8 5 0 85 30 68 62 65 71 74 77 80 86 89 92 83 59 53 56 47 50 44 38 41 29 32 35 23 26 20 0 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 Working radius m Lifting height m H operating condition working ...

Page 15: ... 7 3 5 3 1 3 0 2 5 66 68 2 9 2 5 2 4 68 SCC2600ACrawlerCrane HOperatingConditionLoadCharts Boom length 20 86m Rear counterweight 100t Carbody counterweight 30t Boom length m Radius m 20 23 26 29 32 35 38 41 44 47 50 53 Boom length m Radius m 5 260 0 5 6 238 4 224 9 223 6 204 2 194 0 6 7 207 9 207 6 202 2 191 4 174 4 169 1 165 0 158 0 7 8 183 8 178 3 174 4 170 6 166 3 157 9 156 5 141 8 126 3 125 0 ...

Page 16: ...ed jib jib angle 10 30 Lifting height m Working radius m 80 75 85 90 95 115 105 110 100 70 60 65 55 50 45 35 40 25 30 15 10 20 5 5 15 10 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 Boom 62m Jib 42m Boom 62m Boom 62m Boom 62m Boom 62m Boom 62m Boom 62m Boom 62m Boom 62m Boom 62m Jib 36m Jib 30 5m Jib 24 5m Jib 19m Jib 13m Jib 36m Jib 30 5m Jib 24 5m Boom 62m Jib 19m Boom 62m Jib 42m Boom 29m Jib 4...

Page 17: ...ixed jib load CHARTS Unit t SCC2600A Fixed Jib Load Charts Without Jib Head Pulley Block Without main hook jib angle 10 Boom length m 41 47 Boom length m Jib length m Radius m 13 19 24 5 30 5 36 42 13 19 24 5 30 5 36 42 Jib length m Radius m 10 10 12 63 3 53 0 64 1 12 14 57 3 47 7 42 5 59 3 53 1 14 16 52 6 43 7 38 5 30 5 51 1 50 4 42 8 30 7 16 18 46 4 40 4 35 5 29 7 22 1 44 6 44 3 40 9 30 1 22 5 1...

Page 18: ...ject is lifted slowly and stably from the level and hard soil ground Fixed jib load CHARTS SCC2600A Fixed Jib Load Charts Without Jib Head Pulley Block Without main hook jib angle 10 Boom length m 59 62 Boom length m Jib length m Radius m 13 19 24 5 30 5 36 42 13 19 24 5 30 5 36 42 Jib length m Radius m 10 10 12 12 14 54 7 46 5 53 6 14 16 47 3 46 0 36 5 46 4 43 5 35 0 16 18 41 4 41 1 36 1 27 3 40 ...

Page 19: ...7 4 22 24 22 7 18 2 16 23 8 19 1 16 7 24 26 21 9 17 5 15 3 13 3 23 18 4 16 13 9 26 28 21 1 16 9 14 7 12 8 11 8 22 2 17 7 15 4 13 3 28 30 20 4 16 3 14 2 12 3 11 4 21 6 17 1 14 9 12 8 11 8 30 32 19 8 15 7 13 7 11 8 10 9 10 20 9 16 6 14 4 12 4 11 4 10 4 32 34 19 3 15 2 13 2 11 4 10 5 9 6 20 4 16 1 13 9 12 11 10 34 36 18 8 14 8 12 8 11 10 1 9 3 19 9 15 6 13 5 11 6 10 6 9 7 36 38 18 3 14 3 12 4 10 5 9 ...

Page 20: ... is lifted slowly and stably from the level and hard soil ground SCC2600A Fixed Jib Load Charts Without Boom Hook and Counterweight 100 30t Without main hook jib angle 30 Boom length m 59 62 Boom length m Jib length m Radius m 13 19 24 5 30 5 36 42 13 19 24 5 30 5 36 42 Jib length m Radius m 16 16 18 27 6 27 7 18 20 26 6 21 2 26 8 20 22 25 7 20 5 25 9 20 6 22 24 24 9 19 8 17 1 25 1 19 9 17 2 24 26...

Page 21: ...63 1 2 3 26 62 65 88 Luffing jib combination Luffing jib operating condition working range diagram Jib top 6m Jib 12m section 3pieces Jib 6m section 2pieces Jib 3m section 1pieces Boom section 6m Boom section 26m 62m Lifting height m Working radius m Boom angle 88 63m 60m 57m 54m 51m 48m 45m 42m 39m 36m 33m 30m 27m 24m 21m 0 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 75 62m 15 15 26...

Page 22: ...5 49 2 48 6 45 4 49 1 47 4 44 7 48 4 43 7 47 7 22 24 41 7 44 5 44 5 41 4 44 3 43 4 40 7 44 3 42 7 39 9 43 7 41 1 24 26 38 4 40 8 41 0 38 3 37 9 40 6 39 9 37 5 40 7 39 3 36 5 40 1 37 9 26 28 33 3 37 6 37 7 35 2 35 1 37 4 37 0 34 8 34 8 37 3 36 3 34 2 34 0 37 0 35 1 28 30 28 3 33 1 34 6 32 3 31 1 30 8 34 5 34 0 32 1 32 1 34 3 33 9 31 8 31 5 34 2 32 7 31 1 30 32 23 6 28 2 31 9 29 8 28 7 26 8 30 9 31 ...

Page 23: ... 57 60 63 Jib length m Boom angle Radius m 88 85 80 75 70 65 88 85 80 75 70 65 88 85 80 75 70 65 Boom angle Radius m 10 10 12 12 14 14 16 16 18 18 20 31 0 28 2 20 22 30 5 27 7 25 3 22 24 30 1 29 9 27 3 27 2 24 9 24 26 29 5 29 4 26 9 26 7 24 6 24 5 26 28 29 1 29 0 26 6 26 5 24 1 24 0 28 30 28 8 28 5 28 0 26 1 26 0 23 8 23 7 30 32 28 3 28 3 27 7 25 7 25 7 25 2 23 3 23 3 32 34 26 6 27 5 26 3 25 3 25 ...

Page 24: ...4 45 8 46 7 45 1 45 9 44 3 45 3 43 7 22 24 43 6 42 0 39 6 42 8 41 4 39 0 42 2 40 7 41 6 40 1 24 26 40 2 38 8 36 5 39 6 38 2 35 9 39 0 37 5 35 3 38 4 37 1 34 8 26 28 37 4 36 0 33 8 36 8 35 5 33 3 36 2 34 8 32 7 35 6 34 4 32 2 28 30 34 9 33 6 31 6 29 6 34 3 33 0 31 1 29 2 33 8 32 5 30 4 33 3 32 0 30 1 30 32 31 7 31 5 29 5 27 7 32 1 31 0 29 0 27 2 31 6 30 3 28 4 26 6 31 1 30 0 28 1 32 34 29 3 27 7 26...

Page 25: ...b length m 57 60 63 Jib length m Boom angle Radius m 88 85 80 75 70 65 88 85 80 75 70 65 88 85 80 75 70 65 Boom angl e Radi u s m 18 18 20 28 4 26 0 20 22 28 1 25 7 23 6 22 24 27 7 27 5 25 4 23 2 24 26 27 4 27 2 25 0 24 9 22 9 22 8 26 28 27 1 26 8 24 7 24 6 22 6 22 5 28 30 26 7 26 6 24 4 24 2 22 2 22 1 30 32 26 4 26 3 25 5 24 0 23 9 22 0 21 9 32 34 26 1 25 8 24 0 23 7 23 6 23 0 21 6 21 5 34 36 25 ...

Page 26: ... 44 1 41 9 42 4 41 2 39 0 39 3 22 24 41 2 39 2 40 6 38 5 40 0 37 9 38 5 37 4 24 26 38 2 36 3 33 1 37 6 35 6 32 6 37 0 35 0 36 5 34 6 26 28 35 6 33 7 30 8 35 0 33 1 30 2 34 4 32 6 29 7 33 9 32 1 29 3 28 30 33 2 31 5 28 7 32 7 31 0 28 2 32 1 30 4 27 6 31 7 30 0 27 3 30 32 31 1 29 5 26 8 24 4 30 6 29 0 26 4 30 1 28 4 25 8 29 7 28 1 25 5 32 34 29 3 27 7 25 2 22 9 28 8 27 3 24 8 22 4 28 3 26 7 24 2 27 ...

Page 27: ...ength m Jib length m 57 60 63 Jib length m Boom angle Radius m 88 85 80 75 70 65 88 85 80 75 70 65 88 85 80 75 70 65 Boom angl e Radi u s m 20 25 6 20 22 25 3 23 2 21 4 22 24 25 0 23 0 21 2 24 26 24 8 24 7 22 7 22 7 20 9 26 28 24 5 24 4 22 4 22 4 20 6 20 5 28 30 24 2 24 1 22 2 22 1 20 3 20 3 30 32 23 9 23 9 22 0 21 9 20 2 20 1 32 34 23 7 23 6 21 6 21 7 21 6 19 9 19 8 34 36 23 4 22 7 20 3 21 4 21 3...

Page 28: ...6 0 37 9 33 8 35 2 31 8 32 7 22 24 36 7 36 3 35 0 35 6 33 1 34 7 31 1 32 2 24 26 35 7 33 6 34 0 33 0 32 3 32 4 30 5 31 8 26 28 33 7 31 3 27 5 33 0 30 8 27 0 31 5 30 2 29 9 29 8 28 30 31 5 29 3 25 7 31 0 28 7 25 2 30 4 28 2 24 7 29 3 27 8 30 32 29 6 27 5 24 0 29 1 26 9 23 6 28 5 26 5 23 0 28 2 26 0 22 7 32 34 27 9 25 8 22 6 27 4 25 4 22 1 26 9 24 8 21 6 26 5 24 5 21 3 34 36 26 2 24 4 21 2 20 4 25 9...

Page 29: ... m Jib length m 57 60 63 Jib length m Boom angle Radius m 88 85 80 75 70 65 88 85 80 75 70 65 88 85 80 75 70 65 Boom angl e Radi u s m 20 22 4 20 22 22 1 20 5 19 1 22 24 21 9 20 3 18 8 24 26 21 6 21 7 20 1 18 6 26 28 21 3 21 5 19 8 19 9 18 4 18 4 28 30 21 1 21 2 19 6 19 7 18 2 18 2 30 32 20 9 21 1 19 4 19 4 18 0 18 0 32 34 20 6 20 9 19 2 19 3 17 7 17 8 34 36 20 3 20 6 17 8 18 9 19 1 17 6 17 6 36 3...

Page 30: ...88 14 82 74 16 66 62 8 18 52 5 53 4 20 19 49 46 2 22 40 4 24 35 8 26 31 9 28 28 6 30 25 8 Notes 1 The actual weight is a value that the rated weight in this table is subtracted by the weights of the hooks hangers and wire ropes winding on the hooks and on the boom head 2 The rated load in this table is measured under the condition that the heavy object is lifted slowly stably from the level and ha...

Page 31: ...hines illustrated may show optional equipment which can be supplied at additional cost Address SANY Industrial Park No 8 Beiqing Road Huilongguan Town Changping District Beijing Service Hotline 0086 4006 098 318 Email crd sany com cn For mord information please visit www sanygroup com B05S2ENAN1 SCC2600A Version 2015 10 ...

Reviews: