(6901-002111 <02>)
10
5
Cable Management
Pull each arm to its full
extension then route the
cables through the arm. Leave
enough slack to prevent
stretching the cables when the
arm is moved.
Reattach arm covers.
Install the upper and lower
covers
[22].
Remove the arm covers.
concrete only
[22]
[22]