background image

 

Santint   

PA Series Paint Mixing Machine                                V1.1                                                                             

3.

 

Technical Parameters  

4.

 

Setup Preparation  

Keep this manual at hand for future use.   

The paint mixers are delivered    in sets. It might be packed in several cartons or in one carton.   

Follow the installation    procedures listed in the manual.   

Open the motor package, take out the tools and spare parts as well as the technical documents such 

as the user manual. If there is any issue, contact us in time.   

Check  the  power  supply  voltage  frequency  to  see  whether  it  is  in  line  with  the  data  on  the 

nameplate of    the equipment motor.   

This manual is general for the Perfitall series. The figures shown and the number of the cans might 

be different from your products. The installation procedures and usage methods are the same.     

5. Setup 

5.1 Spare Parts 

   

 

 

 

 

Perfitall 

NO. of Cans at 

Each Shelf 

Mixing Speed 

RPM

 

Dimension 

Standard Configuration

 

6 Series 

6 big /9 small 

72 

1360 X 630 X 2077

 

8 Series 

8 big/12 small 

72 

1720 X 630 X 2077 

10 Series 

10 big/15 small 

72 

2080 X630 X 2077 

12 Series 

12 big/18 small 

72 

2440 X 630 X 2077 

Working  Environment: 

Temperature:  5

  -  38

  Relative  Humidity:  MAX 

80% (+25

)

 

01---Bottom Cover 

02---Big Can Cover 

03---Bottom Plate 

04---Big Can Shelves 

05---Pulling Strip 

06---Right Mudsill 

07---General Shelves 

08---Right Side Plate 

09---Decorative Plate 

10---Switch Box 

11---Left Side Plate 

12---Small Can Cover 

13---Power Assembly

 

Summary of Contents for Perfitall 10 Series

Page 1: ...Santint PA Series Paint Mixing Machine V1 1 1 Perfitall Series Paint Mixing Machine User Manual Please read this manual carefully prior to operation...

Page 2: ...tional Parts 9 5 3 1 Platen 9 5 3 2 Left Right Hanging Plate 9 5 3 3 Back storing Shelf and Mica Shelf 10 6 Usage 11 6 1 Check up Before Usage 11 6 2 Operation 12 7 Troubleshooting 12 8 Repair 13 8 1...

Page 3: ...e following instructions prior to first usage 1 Don not let children approach the machine 2 The machine must be placed in dry and well ventilated space kept far away from the heat source flammable gas...

Page 4: ...ual is general for the Perfitall series The figures shown and the number of the cans might be different from your products The installation procedures and usage methods are the same 5 Setup 5 1 Spare...

Page 5: ...bolts to fix the right side plate on the right mudsill 5 2 4 The finished position is shown in 5 2 5 Notes The power assembly and the right mudsill shall be located in the predefined position or lean...

Page 6: ...stment of Backing Plate Support Units Put the general shelves assembly onto the backing plate supportive units 5 2 11 Use four M8X12 screws to fasten the shelves onto the holes of the left and right s...

Page 7: ...Santint PA Series Paint Mixing Machine V1 1 5 Adjustment of Backing Plate Support Units Standard Configuration 4L 2 5L 1L 4L 2 5L 1L Big Small Big Small Big Small Plate Rack Plate Rack Plate Rack...

Page 8: ...e side plate assembly 5 2 14 5 2 15 6 Driving Link Rod Insert the coupler end of the general drive link rod into the coupler of the drive assembly the other end shall be inserted into the transmission...

Page 9: ...em on the 5X24 spring pin of the vertical driving shaft The other end shall be insert into the shelve assembly shaft 5 2 21 Open the big small can covers and keep them cover the link rod assembly then...

Page 10: ...switch into the three holes of the left side plate Press them down to fasten the switch box onto the left side plate 5 2 25 5 2 26 Now the equipment has been assembled Connect the power supply see th...

Page 11: ...onto the left and right fixing plates Use four bolts M4 X 16 to fix them with the shelves with holes 5 3 4 5 3 2 Left Right Hanging Plate 1 Use the horizontal hook on the right hanging plate to hook...

Page 12: ...rt the two bulging ends of the back storing shelves into the slots of the back storing supportive plates The short one shall be hung on the supportive units of the back storing shelf 5 3 12 3 Connect...

Page 13: ...cans shall not be deformed 3 Make sure the mixing lid is fasten prior to install the cans onto the equipment 4 Make sure the paints are mixed even prior to install them onto the equipment one by one...

Page 14: ...7 Troubleshooting Symptoms Diagnosis Troubleshooting Motor does not work or is overloaded No power supply Check the socket the power cord small circuit breaker or the fuse to ensure Switch Box in char...

Page 15: ...2 Hold the broken spring pin with steel column or iron nail Knock it off with a hammer softly Install a new one 8 2 2 3 Dismantle the broken jackscrew replace it with a new one 8 3 Replace the Plasti...

Page 16: ...ondition and reduce accidence you should do daily and periodical maintenance Note Be careful when do these maintenance 9 1 Daily Maintenance Clean the machine and the paint leftover on tins and mixing...

Page 17: ...Santint PA Series Paint Mixing Machine V1 1 15 10 Nameplate...

Page 18: ...SANHUA TECHNOLOGY INDUSTRY CO LTD ADD Xushui Industrial Trading Park Zhongyuan West Road Zhengzhou City Henan Province PR China 450042 TEL 86 371 67857168 After Service 86 371 67857319 FAX 86 371 678...

Reviews: