INSTALLATION INSTRUCTIONS
PAGE 02
Rough installation
- Turn the water supplies off.
- Remove all the trim items (plate and handle) before
installation.
- Secure the valve firmly against the stub.
- Make sure that the shower out let is in the up position.
- Flush or raise grouting on the tiled wall surface.
- Connect the supply lines to the valve inlets.
-
The rough depth
must fall within the minimum/
maximum
range lines marked
on the plaster guard.
- For both functional and esthetic reasons, the valve must
be leveled horizontally.
- When soldering the inlet connection, make sure that all
internal parts are removed to avoid damages to the non-
metal parts.
- If only the shower portion of the valve will be used, keep
the tub outlet plugged at all time.
-
M
a
x
M
in
Finished wall
Minimum and
Maximum Lines
Trim installation
M
a
x
M
in
1.
- Remove the screws from the plaster
guard.
- Remove the plaster guard.
Thermostatic control