background image

DESCRIPTION

This product is precision engineered to provide satisfactory performance provided it is installed and operated in 

accordance with our recommendations contained in this manual.  In order to fully enjoy the comfort, safety and the 

reliability of your pressure balancing valve, be certain to familiarize yourself with the contents of this manual.

SPECIFICATIONS AND DIMENSIONS

Minimum operating pressure      20 psi

Maximum operating pressure   145 psi

Maximum test pressure             500 psi

Hot and cold water inlets          ½" IPS

Shower outlet                            ½" IPS

Flow capacity  5 USGPM @ 50 psi

Finished wall adjustment : see Illustration B

INSTALLATION

NOTE: Failure to follow these instructions may cause damage or improper operations and nullify the warranty.

ROUGH IN

-  Make sure the water supplies are off.

-  Remove all the trim items (plate, handle and flange) before installation.

-  Secure the valve firmly against the stud. Make sure the ½" shower outlet is in the up position.

-  Make sure to flush or raise grouting on the tiled wall surface.

-  Adjust the All Thread depth against the Teflon Washer and Limit Stop.

   Screw the All Thread against the Teflon washer until it is pressured gently against each other.

-  Tighten firmly the Lock Nut against the Lock Plate.

-  Position the valve using the dimension shown in the illustration B.

INSTALLATION INSTRUCTIONS

LOCK NUT

LEVER PLUG O-RING

HANDLE ASSEMBLY

Trim Plate

ILLUSTRATION B

PAGE 02

WALL LINE

46"

78"

(1981 mm)

FLOOR

LINE

3. 25”

All Thread

Stem

Lock Nut

Lock Plate

center of inlet

finished wall

Pressure Balanced Shower

PLASTIC WASHER

SET SCREW

VENT PLUG

Summary of Contents for Novo 2831EM10-TM

Page 1: ...BOOKLET FOR FUTURE REFERENCE PLEASE READ THE INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION This is a general installation instruction for the following collections Monza Novo Pressure Balanced Shower 7 3 750 1 913 0 188 ...

Page 2: ...age or improper operations and nullify the warranty ROUGH IN Make sure the water supplies are off Remove all the trim items plate handle and flange before installation Secure the valve firmly against the stud Make sure the shower outlet is in the up position Make sure to flush or raise grouting on the tiled wall surface Adjust theAll Thread depth against the Teflon Washer and Limit Stop Screw the ...

Page 3: ...ck position thread handle assembly onto all thread by using escutcheon being caution not to over tighten Tightening the set screw using the allen key and insert the o ring and vent plug to cover the hole INSTALLATION INSTRUCTIONS All Thread Lock Nut Lock Plate LOCK NUT HANDLE ASSEMBLY Trim Plate Stem PAGE 03 C OLD WARM WARMER HOT ILLUSTRATION C PM 280 SERVICE VALVE OPTIONAL VALVE CARTRIDGE TE010 M...

Page 4: ...ched to an insert that is fitted into the valve body inlets With the cartridge removed the 2 inserts and filter screens can be easily removed from the valve body Remove the insert by pressing the top corner This will rotate the insert allowing easy removal There is a place on either side of the filter insert where you can get your finger nail underneath the filter screen By pulling the filter scre...

Reviews: