20/52
5
Preparation before you start
5.1 Climber unit, battery pack and handle unit
The following preparations need to be
made to the Liftkar PT as a base unit:
1.
Fit battery pack over the brown
contact housing on the climber unit
with the recess pointing towards the
handle mounting socket
(photo 1)
.
DO NOT FORCE.
2.
Insert the handle unit column into the
battery pack recess
(photo 2
) and into
the mounting socket. Press the handle
unit down into the mounting socket
until the lever screw on top of the
control cluster is pressed upwards
(photo 3).
3.
Tighten the lever screw clockwise.
4.
Switch on the main switch (LED display should light up green).
5.
Select climbing speed I-II-III (Beginners should always select I).
6.
Test the brakes
(see section 9.4).
7.
Experienced/ professional operators only:
if required, press mode switch III
to switch from single-step mode to continuous mode.
2
3
1