Summary of Contents for Palert
Page 3: ......
Page 4: ......
Page 7: ...3 Using bubble level meter measure the leveling of PALERT frame fixed place...
Page 11: ...5 Screwing the SHCS screw between the back board and the frame Frame Back Board...
Page 12: ...5 Locking the PALERT on the back board with the M4 screws...
Page 13: ...6 Connect the power and Ethernet cable and then finished the PALERT hardware installation...