•
Feet Installation
1.
Turn bath upside down on a clean carpet or blanket.
2.
Place feet on points A as indicated on Figure.2
*
The front and back
sets are not the same.
3.
Place the feet on the bottom of the bath and seal with
silicone adhesive.
4.
Leave to dry for 24hrs.
5.
Turn the bath upright and using a spirit level check that
bath does not wobble and stands sturdy over the drain
waste line.
•
Plumbing Installation
6.
Plumber inserts plug into waste hole of bath.
7.
Install drain supplied with Pop Up drain kit onto waste
installed in Step 1.
8.
Set up drain waste kit, apply plumbers’ putty to drain
waste basket, screw in Pop Up drain kit.
!
-
The tubs weight may vary.
We
recommend that the installation be
done by 2 people, as a security
precaution.
-
Also, make sure to adopt a good posture when lifting the tub.
-
The diagrams in this guide are not construction plans; they are visual
aids.
Tools
fig. 1
fig. 2
Nikki filler spout/
overflow
Soft-touch pop drain
Drain nut, use only if
tubular brass
connection
is in use
Direct verticle/90
degree Elbow drai
n
waste