ENGLISH
5
NT_51897201_RHE-AN_130516.docx
Before starting, check the following points :
Make sure that the device does not contain any foreign body.
Make sure that all the components are attached in their original placements.
Check manually that the fans do not rub or are not blocked.
Make sure that the rotating heat exchanger is not blocked.
Check the earthing connection.
Make sure that the access doors are properly closed.
Acceptance – Storage
1.3
In case of missing, non-conforming, or totally or partially damaged delivered products, the Purchaser must
make written reservation on the transporter’s receipt and confirm them within seventy-two (72) hours by
sending a recommended letter to the transporter, as well as a copy to S&P. Acceptance of the equipment
without any reservation will deprive the Purchaser of any subsequent recourse against us.
The product must be stored in an area protected from bad weather, shocks and stains due to splashings
or splatterings of any kind during its transport from the supplier to the end customer and onto the worksite
before installation.
Warranty
1.4
The equipment supplied by S&P is warranted twelve (12) months – Parts only – starting from the invoicing date.
S&P agrees to replace the parts or the equipment whose operation is recognised defective by our
departments except for all damages and interests or penalties such as operating losses, commercial
prejudice, or other immaterial or indirect damages.
The following are not covered by our warranty: defects resulting from an abnormal usage or a usage not
conforming to the recommendations of our manuals; faults observed as a consequence to normal wear ;
incidents caused by negligence, lack of monitoring, or servicing ; faults due to the incorrect installation of
the devices or to bad storage conditions before mounting.
In any case, S&P will not be responsible for transformed equipment, repaired even partially.
2. PRODUCT RANGE PRESENTATION
Range
2.1
Use
Extraction of stale air and supply of fresh air in public/private premises with heat recovery by a rotating
heat exchanger. Installation on feet indoor or outdoor with accessories.
4 Sizes : 1300
(1 300 m
3
/h),
1900
(1 900 m
3
/h),
2500
(2 500 m
3
/h),
3500
(3 500 m
3
/h).
4 Models :
RHE D:
without heater.
RHE DI :
integrated post-heating electric heater.
RHE DC :
integrated hot water coil.
RHE DFR :
integrated reversible cold water/hot water coil (HD model only).
3 Constructions :
HD :
In-line connection of the ducts - indoor installation.
OI :
In-line connection of the ducts with roof mounted for an outdoor installation.
VD :
Connection of the ducts by the top – indoor installation.