background image

12

    

+ !#

.

-

 

  ! 

 !

!#!+

)+*

&(  

 ! "!
 !  # 

 !
"!
 ! 

"!
%!! 

"!
 "& 

$  "&
!
%!! 

$  "&
!
"& 


$  "&

 !
"!
 ! 

%!

  

-(.-+

/0

/2 .
02 -

12 

'

!

(! 

 !(!

!! +

.

-

!

Summary of Contents for DOMEO 210 RD

Page 1: ...DOMEO 210 RD DOMEO 210 RD SC EN...

Page 2: ......

Page 3: ...aintenance 3XWWLQJ RXW RI VHUYLFH DQG UHF FOLQJ CONTENTS The following items are included 1 1 x DOMEO 210 RD 2 1 x remote control 3 1 x console programming Excepting Domeo 210 RD SC model 4 1 x wall b...

Page 4: ...per use Normal wear of components Failure to follow the instructions in this manual concerning safety use and installation The use of parts not supplied by Soler Palau 1 3 Safety General health and sa...

Page 5: ...ency heat exchanger used in the DOMEO performance can reach 92 Condensation forms during the heat exchange process and is recovered in the condensate tray which must be connected to a waste water drai...

Page 6: ...ir Connect the extract duct from the toilets bathrooms and the kitchen To avoid thermal losses and optimise the performance of the installation it is recommended to use insulated ducts for the warm ai...

Page 7: ...he possibility to modify the connecting side Type A Connection of the condensation drain on the right or Type B Connection of the condensation drain on the left In case of Type B you must invert the f...

Page 8: ...le to install the DOMEO in the heated area of the house If not it is mandatory to isolate the condensation drain Wall bracket In areas where temperatures are regularly negative or can drop below 10 C...

Page 9: ...125 BDO or BOAP 125 BDO or TPM 80 If using insulated flexible ducting it is imperative to fully stretch it Or Air intake PAQS125 BDO or TPM 80 RD 80 RD 80 PLENUM UNI EX 5P 125 PLENUM UNI 6P 125 I WKH...

Page 10: ...RD80 Air intake PAF 125 Or Or Air intake PAQS125 SAMPLE DISTRIBUTION ASSEMBLY Living Room Bedrooms If using insulated flexible ducting it is imperative to fully stretch it I WKH XQLW LV FRQQHFWHG WR D...

Page 11: ...e 50 C Maximum flow temperature 45 C Connection box Electrical panel In areas where temperatures are regularly negative or can drop below 10 C it is advisable to install a preheating battery Power wir...

Page 12: ...12 0 2 0 2 1 2...

Page 13: ...10 m3 h AIQ sensor setting parameters Value QMini 0 10V 60 210 m3 h 60 m3 h Value QMaxi 0 10V 60 210 m3 h 120 m3 h Value VMini 0 10V 0 10V 0 Value VMaxi 0 10V 0 10V 10 Automatic Bypass On Off ON T ext...

Page 14: ...key and move to the next step with the key 6 QFKURQL DWLRQ 7KH 20 2 FRXOG EH SLORWHG E D PD LPXP RI UHPRWH FRQWUROV RU RQO UHPRWH FRQWURO DOZD V XVH WKH Q 7R ELQG HDFK UHPRWH FRQWURO IROORZ WKH QH W 2...

Page 15: ...lt free contact The electronic board is equipped with a volt free contact that allows increase to the boost airflow controlled by an external sensor switch CO2 sensor PIR sensor humidity sensor You ca...

Page 16: ...ys then confirm with the key High airflow air quality sensor Setting of the maximum airflow Enter with the key choose the airflow value with the keys then confirm with the key Minimum voltage of the a...

Page 17: ...preheating temperature Allows adjust the start up temperature of the preheating temperature Factory setting 0 C Setting range 15 C 5 C Enter with the key and choose the temperature with the keys then...

Page 18: ...operation OFF Defrost stopped Battery status Allows viewing if the preheating PRE and post heating POST batteries are running PRE OFF Stopped PRE ON Working POST OFF Stopped POST ON Working Software v...

Page 19: ...ppears and after few seconds the installation level appears Very good Good Acceptable Bad Discharge temperature sensor Allows viewing the temperature on the discharge ductwork downstream of the core T...

Page 20: ...green LED A button that enables the boost airflow for 30 minutes to be selected in hour steps By pass Flashing green LED On having avoided the heat exchanger the 100 by pass system of the DOMEO allows...

Page 21: ...ry settings 12 months 15 months Filter Alarm Timing 6 SWITCHING ON THE DOMEO To start your DOMEO unit use the following process 1 Verify that all system components are correctly installed and connecte...

Page 22: ...he main rooms Remove filter cover Put back filter cover Extraction Filter G4 Fresh Air Filter F5 Connection Type A Fresh Air Filter F5 Extraction Filter G4 Connection Type B Remove the core hardly wit...

Page 23: ......

Page 24: ...S P SISTEMAS DE VENTILACI N S L U C Llevant 4 Pol gono Industrial Llevant 08150 Parets del Vall s Barcelona Espa a Tel 34 93 571 93 00 www solerpalau com Ref 9023058700 03...

Reviews: