Shipping and Handling
Inspection
Examine the shipment for external evidence of damage as
soon after receipt as possible, preferably before removal from
the carrier’s conveyance. Check the bill of lading to make sure
all shipping skids and containers listed thereon are present.
If there is visible loss and/or damage:
1. Notify the delivering carrier immediately.
2. Ask for a carrier inspection.
3. Note the condition of shipment on all copies of the delivery
receipt.
4. File a claim with the carrier.
If concealed damaged is discovered:
1. Notify the delivering carrier within 15 days of receipt of
shipment.
2. Ask for a carrier inspection.
3. File a claim with the carrier.
Also notify S&C Electric Company in all instances of loss
and/or damage.
Handling
NOTICE
The PCS enclosure shall be lifted according to lifting
drawing PEA-1610-4-IN and any other project-specific
lifting drawings supplied with the PureWave SMS-250
system . Lifting equipment such as spreader bars and
hoist sling straps are provided by others .
To avoid damaging the PCS enclosure when placing it at the
desired location, observe normal recommended procedures
as well as the following general instructions.
CAUTION
The PCS installer must ensure ALL lifting equipment,
beams, slings, chains, spreader bars, and apparatus
are properly rated for the identified load . Failure to do
so can result in equipment damage and personal injury .
NOTICE
Before lifting the PCS enclosure, make sure all doors
are closed and locked . The doors contribute to the
structural integrity of the system and, if left opened,
increase the risk of damage to the enclosure during
lifting .
WARNING
When handling the PCS enclosure with an overhead
hoist, observe standard lifting practices as well as the
following general instructions . Failure to follow these
procedures can result in serious personal injury and
equipment damage .