14    S&C Instruction Sheet 761-525

Installation

Installing the Vertical Operating Pipe

Follow these steps when installing the vertical operating 
pipe:

STEP  10.  

One of the pipe sections furnished is threaded at 
one end to accommodate the operating handle 
assembly. See Figure 11. Install this section of 
pipe last, with the threads at the lower end.

If only one vertical operating-pipe section 

is required, proceed to Step 13 on page 15.

STEP  11.  

Position and install the rod guide(s) with the 
arm pointing upward on the pole or structure in 
accordance with the dimension shown on the 
erection drawing. See Figure 12. A positioning 
stud is furnished which holds the rod guide arm 
at 45 degrees.

STEP  12.  

Install the upper section of vertical operating 
pipe between the interphase drive lever 
cou pling and the uppermost rod guide, with the 
rod-guide arm pointing upward at a 45-degree 
angle. See Figure 13. (A positioning stud is fur-
nished that holds the rod guide at 45 degrees.)  
Follow the directions in the “Installing Pipe 
Couplings with Piercing Set Screws” section on 
page 12.

Torque the clamp bolts to final tightness. 

Then, tighten the piercing set screws, pierc-
ing the pipe, and continue turning until a firm 
resistance is felt.

If more than one rod guide is used, install 

vertical operating-pipe sections between the 
rod guides in the same manner.

Figure 11. A threaded vertical operating pipe.

Figure 12. Attaching the rod guide.

Positioning stud

Figure 13. Installing the upper operating pipe section into the 
rod guide.

Positioning

stud

Uppermost

section of

vertical

operating

pipe

Clamp

bolt

Summary of Contents for Alduti-Rupter Switches Outdoor Distribution

Page 1: ...Safety Instructions 4 Replacement Instructions and Labels 4 Location of Safety Labels 5 Safety Precautions 6 Shipping and Handling Inspection 7 Packing 7 Handling 8 Installation Mounting to Wood 9 Unc...

Page 2: ...rt product literature Retain this Instruction Sheet This instruction sheet is a permanent part of your Alduti Rupter Switch Designate a location where you can easily retrieve and refer to this publica...

Page 3: ...or implied or arising by operation of law course of dealing usage of trade or otherwise are excluded The only warranties are those stated in Price Sheet 150 or Price Sheet 153 and THERE ARE NO EXPRESS...

Page 4: ...ecautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Page 5: ...e Description Part Number A DANGER Electrocution Hazard G 6580 1 B WARNING Piercing Set Screws G 3176R1 C WARNING Handle Operation G 4400R5 D WARNING Electrocution Hazard Grounding Strap G 6596 This p...

Page 6: ...othing in accordance with safe operating procedures and rules 4 SAFETY LABELS AND TAGS Do not remove or obscure any of the DANGER WARNING CAUTION or NOTICE labels and tags Remove tags ONLY if instruct...

Page 7: ...SX suffix They include S1 One tubular fiberglass insulating section in vertical operating shaft S2 One Cypoxy Insulator unit in vertical operating shaft S6 Key interlock single lock for a locked open...

Page 8: ...fully Closed position during installation of the interphase and vertical operating pipe sections S C recommends tying the switch blades to their jaw contacts with wire or a cable tie WARNING DO NOT li...

Page 9: ...n the same order in which they will be mounted on the structure Protect the bearings from contamination by dirt mud oil etc If necessary use blocks to keep the bearings clear of the ground Attaching C...

Page 10: ...ilure to lift the switch properly can result in switch damage causing improper operation arcing or electrical shock STEP 4 Hoist the switch poles using the lifting angles provided and bolt them into p...

Page 11: ...with blades against their blade stops and the switch drive lever within 1 16 inch 2 mm of the closed stop bolt Tie the switch blades to their stationary main contact assemblies See Figure 7 Figure 6...

Page 12: ...the operating pipe section into the couplingandfinger tightentheclampbolt s c Adjust the operating pipe to the correct length Then tighten the clamp bolt s to final tightness d Tighten the piercing s...

Page 13: ...sure of all three poles STEP 9 Attach the interphase drive lever to the interphase or outboard pipe section in the position shown on the erection drawing See Figure 10 Make sure the lever is at the 45...

Page 14: ...nstall the upper section of vertical operating pipe between the interphase drive lever coupling and the uppermost rod guide with the rod guide arm pointing upward at a 45 degree angle See Figure 13 A...

Page 15: ...y inch 6 mm of thread should extend through the coupling Tighten the locknut See Figure 15 If suffix S8 or S9 is specified refer instead to S C Instruction Sheet 769 510 Type AS 10 Switch Operators If...

Page 16: ...page 17 STEP 16 Fasten the free end of the grounding strap to the lowest vertical operating pipe section a few inches above the operating handle assembly with the U bolt connector provided for this p...

Page 17: ...ing linkage has been taken up STEP 19 If there is still slack repeat the procedure in Step15onpage16butmovetheoperatinghandle more than 20 degrees in the opening direction before torquing the clamp bo...

Page 18: ...extended engages a slot in the locking disc on the operat ing handle See Figure 21 STEP 21 Block one of the two slots in the locking disc with the blocking screw provided The slot to be blocked depend...

Page 19: ...h will occur if the energized switch is operated slowly or left in the partially Open or Closed position Check to make sure the following conditions exist a With the operating handle as far as it will...

Page 20: ...isrequired Move the operating handle to its mid position to take the strain off the operating pipe linkage and loosen the two nuts that clamp the adjustable arm of the interphase drive lever See Figur...

Page 21: ...r readjusting be sure to retighten the clamp bolt and piercing set screw on the pipe coupling at the rod guide or interphase drive lever coupling immediately above the operating handle the nuts on the...

Page 22: ...ur if the energized switch is operated slowly or left in the partially Open or Closed position a As the blade moves in the closing direction clearance between the blade opening cam and the interrupter...

Page 23: ...e parallel to the sweep of the blades and the blades must pass over the interrupter with approxi mately equal clearance on both sides See Figure 32 e If adjustment is required loosen the nuts thatfast...

Page 24: ...tationarymaincontactassemblies See Figure 34 The shunt contacts may be bent as required to conform to these conditions If any of the conditions described in this step cannot be achieved contact the ne...

Page 25: ...Conductors When high voltage conductors are to be connected using aluminum alloy body connectors the following procedures should be employed Thoroughly wire brush the current transfer surfaces of eac...

Page 26: ...precautions may result in serious injury or death NOTICE This interrupter switch is not intended for breaking fault currents STEP 26 To operate the Alduti Rupter Switch a Remove the padlock from the l...

Reviews: