![Samyung STR-6000A Operating Manual Download Page 48](http://html2.mh-extra.com/html/samyung/str-6000a/str-6000a_operating-manual_3801547048.webp)
48
Chapter 5. Installation
5.1. Unpacking Package and Inspection
When dismantling the package, please treat with great care in checking the contents
with order specification. Please observe external surface whether it is damaged during
transportation and if there find damaged parts, then install after proper treatment
made.
In case of handling difficulty, please contact SAMYUNG ENC for proper treatment.
This machine can be installed without technical difficulties, but it needs to keep basic
installation guide lines described hereunder, which helps preserve optimum
performance as it is in the factory.
5.2. Selection of Installation Position for Main Units of STR-6000A
Installation position is selected according to following instruction.
1. Select the place where there is space enough to operate, repair and maintain with
efficient ventilation.
2. Select the place where there is not directly exposed to rain and sea water. Dry area is the
best place for installation electronic equipment.
3. Select the place where there is not directly exposed to sunray and avoid from
heating element.
4. Select the place where there is of little vibration.
5. Select the place where there is of little electrical interference.
5.3. Installation for main unit of STR-6000A
Main unit is to be installed referring to following drawing.
1. Fix the support plate by using screw to table, ceiling or wall. When pull the machine
into the wall, cut out the wall size 147 x 59 first and flush it into the wall.
2. Assemble the unit to the support using handle knob, and fix it at a convenient angle.