9
COMMISSIONING
OIL FILL
Fill the oil tank to centre line of the indicators in the dipstick with hydraulic oil like Shell Tellus T46 or
equivalent. Volume of the tank is 30 litres.
It is recommended to pump the oil into the tank through a 20 filter, because new oil in drums is not pure.
If any oil has run out on the floor, wipe it away.
ELECTRICAL CONNECTION
CAUTION!
Check that the machine voltage (see type plate) is equal to your supply voltage.
For proper installation to local code, consult a licensed contractor.
Bring the supply cable through the hole on the rear of the machine and guide it through the hole on the
rear of the electric box. Secure the cable with a stress relief plug. The minimum size for the cable:
3-phase
: Connect the phase conductors to the respective L1, L2 and L3 terminals in the supply
disconnecting device. Connect the earth connection to the ground terminal on the fixing plate. Check the
connection against the wiring diagram enclosed in the spare parts list.
Check that the motor rotation is parallel with the arrow close to the motor. In case the motor rotates in
rong direction, two phase conductors in the supply disconnecting device must be interchanged.
w
1-phase
: Connect the phase and the neutral to the respective terminals in the supply disconnecting device.
Connect the earth connection to the ground terminal on the fixing plate. Check the connection against the
wiring diagram enclosed in the spare parts list.
SAMWAY 20
SAMWAY 32
Voltage
Cable
Voltage
Cable
400 V / 460 V
230 V / 240 V
400 V / 460 V
230 V / 240 V
2.5 mm² (AWG 13)
4 mm² (AWG 12)
4 mm² (AWG 12)
6 mm² (AWG 10)