84
Set coefficients for a new scan board
Step 1
Specify the LED display area that the new receiver card (scan board) works for. Shown in
Fig.9-19 is the page for specifying the area.
Fig 9-19
Step 2
Select the calibration coefficient source. The coefficients could be from a database (the
Database
option) or generated according to those of the surrounding receiver cards (the
Refer to Surrounding Scan Board
option). Fig.9-20 and Fig.9-21 show the pages for two
option respectively.
Summary of Contents for XA010J
Page 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Page 12: ...12 3 2 Product Appearance ...
Page 13: ...13 ...
Page 14: ...14 3 3 Product design Decomposition chart ...
Page 15: ...15 Assembly drawing ...
Page 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Page 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Page 35: ...35 Installation of cabinets Fixing of connect plate ...
Page 42: ...42 8 2 Port of Cabinet and serial number paint ...
Page 59: ...59 ...
Page 68: ...68 ...