4-16
Disassembly and Reassembly
Samsung Electronics
4-2-11 Belt Timing (Timing Belt), Gear Capstan, Gear Pulley, Lever Review
4-2-11(a) Disassembly
1) Lift up the Lever Review
Œ
.
2) Remove the Washer Slit
´
and lift up the
Gear Capstan
ˇ
.
3) Separate the Pulley Belt Timing (=Timing Belt)
¨
and lift down the Gear Pulley
ˆ
.
Fig. 4-21 Belt Timing (=Timing Belt), Gear Capstan, Gear Pulley, Lever Review
2
3
4
LEVER REVIEW
Œ
GEAR PULLEY
ˆ
´
WASHER SLIT
ˇ
GEAR CAPSTAN
¨
PULLEY BELT TIMING (=TIMING BELT)
4-2-11(b) Reassembly
1) Mount the Gear Pulley
ˆ
and hang the Belt
Timing (=Timing Belt)
¨
on the Gear Pulley
ˆ
.
2) Hang the Pulley Belt Timing
¨
on the lower gear
of the Gear Capstan
ˇ
, and then mount the Gear
Capstan
ˇ
.
3) Insert the Washer Slit
´
.
4) Mount the Lever Review
Œ
.
Summary of Contents for VP-D353
Page 8: ...Product Specification 2 4 Samsung Electronics MEMO ...
Page 24: ...3 16 Alignment and Adjustments Samsung Electronics MEMO ...
Page 58: ...Exploded View and Parts List 5 18 Samsung Electronics MEMO ...
Page 80: ...Wiring Diagram 8 2 Samsung Electronics MEMO ...
Page 82: ...PCB Diagrams 9 2 Samsung Electronics 9 1 Main PCB COMPONENT SIDE ...
Page 83: ...PCB Diagrams Samsung Electronics 9 3 CLK_41 85MHz Œ ˇ ˆ Ø Q708 Q707 Q706 Q704 Q703 Q702 Q701 ...
Page 84: ...PCB Diagrams 9 4 Samsung Electronics CONDUCTOR SIDE ...
Page 90: ...PCB Diagrams 9 10 Samsung Electronics 9 10 CVF PCB COMPONENT SIDE CONDUCTOR SIDE ...
Page 122: ...Operating Instructions 11 10 Samsung Electronics MEMO ...
Page 130: ...Troubleshooting 12 8 Samsung Electronics MEMO ...
Page 154: ...Reference Information 14 12 Samsung Electronics Loading state Unloading state Fig 14 11 ...
Page 164: ...Reference Information 14 22 Samsung Electronics Fig 14 16 LOADING POSTION UNLOADING POSTION ...