40
TCON Board:
Two LVDS Cables from Main Board
1.
Test for 13VDC at both
sides of two Fuses on
the TCON Board.
2.
If no 13VDC on either
side of fuses, check
13V feed from the
LVDS Cables & Main
Board.
3.
If 13VDC only on one
side of fuses replace
defective TCON Board
4.
Inspect LVDS and
Panel Cable
Connectors..
T-CON TEST
T-CON BOARD
T-CON BOARD
TCON Board:
Two 13V DC Fuses
Summary of Contents for UN55HU9000FXZA
Page 1: ......
Page 3: ......
Page 7: ......
Page 8: ...Remote controller Two Remotes Provided HU9000 Remote ...
Page 9: ......
Page 10: ...Front View HU9000 HU9000 Front View ...
Page 11: ...HU9000 ONE CONNECT BOX One Connect Box ...
Page 12: ......
Page 14: ......
Page 16: ......
Page 18: ......
Page 27: ...Remove 6 Screws Lift off the Bottom Cover One Connect Box Jack Pack One Connect Box ...
Page 35: ...HU9000 Block Diagram ...
Page 36: ...Main Board Pin Map 1 2 3 4 5 6 7 8 9 14 13 12 11 10 Inside of HU9000 ...
Page 43: ......
Page 46: ...SAMSUNG Wi Fi Module Bluetooth Module ...
Page 49: ...SAMSUNG 2014 3D ...
Page 56: ......
Page 63: ......