29
2. Product function
2-6. Ice-Maker Function
[Reference table]
3) Initial Operation function
1-1) Whenever the power is on, the control board checks the ice tray leveling with the
leveling switch within 2 seconds.
1-2) If the leveling switch is not off position, the geared motor will turn to the initial
position to make the ice tray leveled.
1-3) When the ice tray is leveled, it will remain this position for 2 hours
(1 cycle time for ice production).
1-4) After 2 hours, the sensor located under the ice tray will measure the tray temperature.
If the temperature is maintained lower than 1 (-17
) for 5 minutes, and the ice full
℉
℃
switch is off position, the ice tray twisting process will begin.
4) Water Supply function
4-1) When the ice tray is levelled again after ejecting ice, the water solenoid value will be
controlled to supply water by time check basis. (See the “Time to supply water” Table)
Leveling S/W
Ice full S/W
Judgement
Remark
ON(“LOW”)
ON(“LOW”)
Not ready
·MICOM Port
PIN #51: Leveling
PIN #51: Ice full
·Port level
OFF : 4.5V ↑
ON : 0.5V ↓
ON(“LOW”)
OFF(“HIGH”)
Not ready
OFF(“HIGH”)
ON(“LOW”)
Not ready(Ice bucket with
full of ice )
OFF(“HIGH”)
OFF(“HIGH”)
Ready
Summary of Contents for RS277ACPN
Page 14: ...15 1 7 Dimensions of Refrigerator inches 1 Product Information...
Page 17: ...18 1 10 Cooling Air Circulation 1 Product Information Freezer Refrigerator...
Page 70: ...71 5 1 Block diagram 5 Circuit Descriptions Double Click...
Page 71: ...72 5 2 SCHEMATIC DIAGRAM 5 Circuit Descriptions Double Click...
Page 72: ...73 5 3 WIRING DIAGRAM 5 Circuit Descriptions Double Click...
Page 74: ...75 5 5 CONNECTOR ARRANGEMENT Main Board 5 Circuit Descriptions Double Click...
Page 87: ...88 5 17 Load Drive Circuit 5 Circuit Descriptions Double Click...
Page 92: ...93 6 Reference Information 6 2 Model name nomenclature...
Page 93: ...94 The End Thank you...